SECTION I: Assessment of Major Threats and Protective Actions - Page 8
1. FireSECTION II: Documentation
2. Moorings
3. Asbestos
4. Visitor Safety
5. Deck Leaks
6. Bilge Pumps
7. Loss, Damage and Vandalism
8. Rain Damage - Weather Deck
9. Maintenance Procedures
10. Sewage
11. Administration
1. Documentary EvidenceSECTION III: Stabilization
2. Assessment and Surveys
1. Painting and Metal PreservationAppendices (Listed but not included)
2. Cathodic Protection
I. Assessment / Documentation
Tri-Coastal Marine
II. ProtectionPreliminary Survey (12/94)R. Bardsley, NSWCCD Code 624
Mooring Recommendations (6/96)Galvanic Corrosion Survey (9/97)GA EnvironmentalAsbestos Survey (2/96)AAM / MAP IIPreservation Assessment (1/98)Conservation CenterPreservation Overview Survey (5/96)HABS / HAERHAER Report # PA-428 (1/98)Plans search(Nat’l Archives, SFNMMA) Staff (97)Staff & pro-bono consultantsVarious topics; on-goingNR NAVSEA DETDonation Ship Inspection (7/97)
Moorings & Fendering - Renew & improve (97-98)III. Stabilization
De-watering & inspect bilges - Staff (5/96)
Electrical Upgrades - Re-wire & rationalize ship’s service (8/98)
Fire Prevention - Removals & Procedures (6/96)
Fire Protection - Alarms & Extinguishers (10/98)
Phila. Fire Dept. + USCG - Fire Planning (12/98)
Plumbing Compliance - Staff (3/97)
Health & SafetyLocal Asbestos Abatement (4/96)Inspection Procedures - Staff (12/96 on-going)
Exits, Alarms & Emerg. Light (8/96)
Procedures & Policies ; staff training (5/96 on-going)
Burglary / VandalismAlarm system upgrades (5/96; 6/97)Secure storage of paper materials - Museum Staff (1996)
Security Fencing (12/97)
Deck Waterproofing - Contractor & staff & volunteers (10/96 - on-going)IV. Funding
W/T Compartmentation - Staff & Vols. (On-going)
Removal of paper-based artifacts - Staff (6/96)
Hull patching - Staff & Vols. (1/98)
Draft Collections Policy - Staff (5/96)
Lead Paint Removal & Recoating - Contractor (11/97)
Dismantle (3) whale boats - Staff & volunteers (7/97)
Secure artifact storage - Staff & Volunteers (12/97)
Keystone (1997)V. Administrative / Operational
Wm. Penn Fdn. (1996)
Haas Charitable Trust (1996-97)
USS LCI National Ass’n (1997)
National Historical Society (1997)
Crown Cork & Seal Co. (1997)
ISM (1996-)
Individuals (1996-)
Budgeting / economyVI. Interpretive
Visitation
PR
Volunteers
Staffing
Photo search (Library of Cong., Nat’l Archives)Phase I Priorities and time-line
Reenactors (7/97)
SPAM War exhibit (5/98)
Removal of inappropriate items to storage (10/97 - )
Exterior Signage (4/98)
Wardroom deck restoration (4/98)
Cruiser OLYMPIA Preservation Project Summary 2/98
I. Assessment / Documentation
Historic Structures Report (Tri-Coastal Marine; begin 5/98)II. Protection
Physical History
Existing Condition
Significance of Fabric and Features
Drawings / Plans / Photographs
Evaluation of Treatment Options
Proposed Treatments / Restoration Plan
Cost Estimates & Schedule of Implementation
Impact of Proposed Treatment
Improve fire detection and alarm systems (1998-99) [NHL Challenge Cost-Share]III. Stabilization
Install bilge alarm system (1998-99) [ NHL Challenge Cost Share]
Design & install pumping system (1998-99) [Keystone Preservation]
Further Asbestos Abatement (1998-99) [Nat’l Maritime Heritage / Keystone]
Stop rain water incursion: deck structures & gun sponsons (1998-99) [Nat’l Maritime Heritage]IV. Funding
Stabilize pilot house and radio shack (2000 - )
Keystone Preservation Grant (1999)V. Administrative / Operational
National Maritime Heritage Grant (1999)
National Park Service Challenge Cost Share Program (1999)
ISTEA Enhancement Grant (2000?)
Maintain & Develop Foundation sources (Ongoing)
Maintain & Develop group & individual sources (Ongoing)
Identify and approach new sources - appropriation (?) (Ongoing)
Enlarge and restructure staff (Technical expertise, preservation / interpretation)VI. Interpretive
Improve visitor experience
Dedicated interpretive staff
Coherent interpretive approach
Develop Interpretive Plan and strategiesBACKGROUND & OBJECTIVES:
Inventory collections and remove inappropriate items to storage
Photo search (Library of Cong., Nat’l Archives)
In June, 1995, Independence Seaport Museum, through its assumption of the Cruiser Olympia Association (COA), effectively assumed both title and responsibility for the two US Navy vessels berthed at Penn’s Landing: USS OLYMPIA and USS BECUNA. Due to the demands of moving the Museum and opening to the public in July, 1995, the Museum did not take an active management role until January 1, 1996, while the original staff managed the ships in the interim. The purpose of this document is to outline the Museum’s preservation and business plans for the future of these historic vessels.
The submarine BECUNA, transferred to the COA in 1976, is in relatively good condition and does not appear to require major maintenance at this point in time.
The OLYMPIA, launched in 1892, has been inactive since 1922, and has been on display as a museum / memorial ship since 1957. Over the last 5 years, approximately, the financial situation of the COA had been such as to preclude extensive, necessary maintenance. In essence, this ship needs more than gate receipts to balance its operations budget; significant maintenance or restoration requires outside sources of funds. Therefore, the COA board voted to have the Seaport Museum take over responsibility for the ships, in hopes that the Museum could more effectively meet the obligations of preserving and interpreting these ships.
The ISM staff, in consultation with numerous ship preservation experts,
has prepared this “Phase I” Plan as a preliminary to undertaking serious
preservation of the OLYMPIA. It is designed to lay the groundwork
for a preservation process which is likely to span 5 to 10 years, and cost
in excess of $5 million. This plan is formatted and drafted according
to the “Secretary of the Interior’s Standards for Historic Vessel Preservation
Projects.” (See appendix) Phase I objectives addressed herein:
1. Administration. Operating costs will be trimmed to the minimum in order to eliminate the deficits of the past few years. It is expected that available funds can be more effectively allocated than in the recent past. The highest priority shall be the preservation of the ship.PROJECT SUMMARY2. Additional Funds. A major aspect of this plan is the fund-raising effort which will begin to gather the resources needed for preservation.
3. Protection. Safeguarding the vessel from damage or loss as the preservation plan is developed and implemented.
4. Assessment and Documentation. In order to ensure that preservation measures are effective and prudent in the long term, it is essential that the Museum become as informed as possible of the ship’s present condition and history. This is the first step in a perpetual process of evaluating and weighing problems and cures.
5. Stabilization. This refers to short-term measures taken to assure the ship’s survival, or to arrest deterioration while long-term remedies are investigated, designed, and funded. Steps will not harm or destroy historic fabric, and will be reversible. Applies to the ship, artifacts from the collections, and archival materials.
6. Long-Range Plan. The ultimate objective of Phase I is to develop a comprehensive, effective, and responsible plan for the preservation and interpretation of the ship and collections well into the 21st century.
The U.S.S. OLYMPIA, a National Historic Landmark and National Mechanical Engineering Landmark, is the sole surviving naval vessel of the Spanish-American War and of the revived American Steel Navy that marked the emergence of the United States as a world power at the turn of the 20th century (See appendix). She served as Admiral George Dewey's flagship at the Battle of Manila Bay in 1898, a pivotal event in our national history. In defeating the Spanish Empire in this crucial engagement, the United States, previously regarded as a regional political power, assumed an important position in international affairs, setting the stage for many of the geo-political events of the next century. During World War I she served as the flagship of the U.S. Atlantic Fleet. At the end of the war, in 1918, she was sent to Murmansk, Russia, as part of the Allied anti-Bolshevik intervention force. Her last major mission was to transport the remains of America's "Unknown Solider" from Le Havre, France, to Arlington National Cemetery for burial in 1921.
Decommissioned in 1922, The OLYMPIA lay neglected for thirty years at an abandoned pier in the Philadelphia Navy Yard. In 1957, the Navy transferred title to the Cruiser OLYMPIA Association, a non-profit entity formed by a group of concerned Philadelphia citizens. The Association exhibited the ship, along with the World War II Fleet Submarine U.S.S. BECUNA, until 1995, when its board elected to suspend operations and transfer responsibility for the ships to Independence Seaport Museum. Prompted by its great historical value and its perennial place as one of Philadelphia's major tourist attractions, ISM assumed responsibility for the OLYMPIA, as well as the BECUNA, in June 1995. Active management commenced in January 1996.
OLYMPIA is a truly unique and important vessel. She is the only American warship of her period still in existence. Internationally, she is one of only three remaining warships of the late 19th century. (The others are: BOEFFEL, currently in Rotterdam, which is predominantly a replica, and AURORA, in St. Petersburg, which was maintained by the former Soviet Union and is currently threatened by a lack of funding.) OLYMPIA retains much of her original fabric, including interior furnishings, one of two steam engines, refrigeration and other systems.
ISM believes that it brings several important professional qualities to this project: curatorial and library staff experienced in maritime artifact and document preservation and conservation; a development staff with the capital campaign experience necessary to secure funding for the vessel's restoration and interpretation; and administrative staff with experience in historic vessel restoration.
In preparation for this project, the Museum commissioned Tri-Coastal Marine of New York, New York to carry out a structural survey of the OLYMPIA in the fall of 1994 (see Appendix .) The surveyors found that nearly fifty years of creeping deterioration and a chronic lack of consistent preservation policies had left the vessel in a poor state of preservation. Wiring throughout the ship was substandard and did not meet generally accepted professional standards in the field, posing a threat to visitors and the ship itself. The weather deck leaked in many places. Resulting water seepage had damaged both the vessel's interior and the artifacts stored within. The collections, assembled haphazardly over the course of thirty years, have never been properly assessed, inventoried or conserved.
In November 1995, a staff team carefully toured the ship and drafted a rough outline for a plan of action in response to the poor condition of both the ship and artifact collections. In order to achieve both the long-term preservation of the ship and its collections, and develop an interpretive approach for visitors, the staff recommended that a long-range phased preservation plan be developed as the first step towards this goal. In order to formulate the plan, assessment of both the ship and collections is necessary in combination with documentation. Outside consultants working with the staff will assist in the development of the plan. Once the plan is complete, the Museum will better understand what needs to be accomplished in a rational and orderly fashion.
In January 1996, the Museum assigned a curator/ship keeper to begin a more detailed assessment of the ship's material condition and to manage the daily functions of the ship. During 1996, numerous additional preservation and safety concerns were identified. Even as assessment continued, work began on protective and stabilizing measures throughout 1996 and 1997. The findings of this assessment process and thework accomplished to date is addressed below. Concurrently, documentation research has proceeded, and the rough outline of long-term preservation needs has become clearer.
As of the end of 1997, significant progress has been made in the Phase I task list:
Assessment: The Museum feels confident that the most critical and immediate threats to the ship have been identified. In addition, the Museum is developing a scope for further assessment required.SECTION I: ASSESSMENT OF MAJOR THREATS AND PROTECTIVE ACTIONSProtection: The most critical priorities have been addressed, to varying degrees. Work planned for 1998-99 should see substantial completion of this list.
Stabilization: Major projects completed to date have halted most of the on-going deterioration of historic fabric. 1998-99 plans should result in substantial completion of work in this category.
Documentation: This has not been a top priority in 1996-97. However, substantial progress has been made in locating repositories of documentary history, and in establishing lines of communication with the custodians. This will be a major focus in 1998-99, through research and writing of a Historic Structures Report and the Phase II Preservation Plan.
Administration: Spending has been brought under control, staff has been professionalized and stabilized. Priorities and objectives are clearly outlined and accomplished. Though the ship’s operating budget is minimal, the Museum has succeeded in achieving a cost-effective and efficient operation.
Funding: Since 1996, the Museum has invested an average of $60,000 per year in capital projects, in addition to the operating budget. Nearly $160,000 in new dollars have been raised for the ship since 1996. The 1998-99 fundraising objective is $335,000, to support the final portion of Phase I and planning of Phase II Preservation. Significant amounts of press and publicity have been generated thus far, and the 1998 Centennial promises to add significantly to public awareness of the ship and project.
Long Range Plan: This is the primary objective for 1998. Plans are in place to create a Historic Structures Report, with emphasis on a comprehensive condition survey and recommendations for strategies of restoration / rehabilitation / replication. Concurrently, funding and operational plans will be developed as aspects of the strategy.
The following list identifies the major threats to the OLYMPIA and lists them in priority of potential damage.
1. FIRE (p.17 Standards)
Condition 1/96: Fire is a serious threat to OLYMPIA.
There are wooden decks and numerous wooden furnishings on board. Many spaces
are cluttered with combustibles and flammable materials. The fire detection
system is inadequate consisting of only two smoke alarms with a detection
range of 25 feet for a 344' long ship with multiple decks and compartments.
Escape routes are inadequately marked, extinguishers are out of date, and
there is only a single pull station which is not readily accessible to
the general public.
1A. Actions taken to date:
- (5/96) Remove 550 cans of flammable materials from ship (paint, solvents, and roofing material from 7 scattered compartments.)1B. Recommended further actions:
- (5/97) Install flammables locker for paintand solvent storage.
- (5/96) No smoking policy.
- (5/96) Install illuminated exit signs and emergency lighting.
- (8/96) Renew, rationalize, and upgrademajor portions of OLYMPIA's electrical system.
- (7/97) Inspect / recharge/ replace extinguishers.
- (9/97) Familiarization walk-through with Phila. Fire Dept.
- (12/97) Develop firefighting action plan with PFD and USCG.
Detectors & Alarms: further upgrades of systems on board. Enhanced system shall include: (1) adequate detection of heat/smoke throughout ship; (2) manual pull stations; (3) audible/visual local alarms for personnel; (4) off-site monitoring; (5) fire department connection. System has been designed and bid (2/98). Funding is being sought through National Park Service’s Landmark Challenge Cost Sharing grant Program. If successful, project should be completed first quarter of 1999.2. MOORING (p. 17 Standards)Wiring: continue to upgrade and rationalize beyond scope of 1996 project. Most critical: install mounted heaters in appropriate spaces, and off-ship emergency disconnect.
Paint Locker: Secure appropriate paint storage location. ( 5/98)
Condition 1/96: OLYMPIA is moored in the Penn's Landing Basin outboard the submarine BECUNA. Four sets of pilings are used to moor the two vessels as there are no bollards or cleats on the basin pier. The mooring is inadequate as the wakes of ships passing in the Delaware River cause severe fore and aft motion on both the ship and submarine at high tide (up to 12 feet fore and aft motion), causing serious damage to the deck railings and three brows.
2A. Actions taken to date:
(7/96) Mooring study & recommendations [Tri-Coastal Marine]2B. Recommended further actions
(2/98) All fiber mooring lines have been replaced with new, and re-tensioned.
(Effectively minimizing fore-and-aft travel)
Wire rope preventers have been rigged fore and aft.
Log “camels” have been removed and replaced with large fenders.
(Eliminated concentrated abrasion at water line)
Determine feasibility of long-term permanent mooring system for OLYMPIA once new location for vessel has been finalized.3. ASBESTOS (Standards, p.17)
Design, fabricate, and install improved brow system.
Condition 1/96: Bindings and coverings over asbestos containing materials within the ship have deteriorated over time. The resulting exposure and possible release of asbestos fibers into the air constitutes a risk to health and safety for staff or visitors in localized areas. Damaged and deteriorated areas must be repaired (“encapsulated”) or removed before humans may enter without protective gear. Heaviest concentrations are in engineering spaces. Most damage is due to rainwater leaks, humidity, or abrasion.
3A. Actions taken to date:
(2/96) Condition discovered. Ship closed and sealed until abatement completed and parts of ship confirmed safe to enter.(4/96) Comprehensive asbestos survey completed. (see appendix) [G.A. Environmental Services, Inc.]
(4/96) Abatement completed in the public areas on the berth and main decks [DAS Environmental] Major areas of ship re-opened to staff and visitors. Seven compartments including the boiler room remain off-limits to all due to the presence of friable asbestos (see appendix)
(1/98) Staff training in asbestos safety and familiarization by industrial hygienist.3B. Recommended further actions:
(1998-99) Complete abatement of all spaces, in order to permit unrestricted staff access for assessment and maintenance, and preservation work. Funds are currently being sought for this project through the National Maritime Heritage Grant Program and Keystone Preservation Grant Program.4. VISITOR SAFETY
4A. Life Rails (Standards p.17, 36)
Condition 1/96: The ship is presently fitted with her original lifelines: two chain courses on 35" stanchions, supplemented with cyclone-type fence secured to the same stanchions. This system is less than ideal from a safety standpoint, but problematic because of the original material. Long-term solutions are still being researched.
To date: Unescorted visitors are no longer permitted on the bow and stern areas of the weather deck.4B. Ladders (Standards, p. 36)
Condition 1/96: The exterior ladders of the ship are a potential tripping and falling hazard. The steps are irregularly spaced with spacings between treads up to 10 ½" and between the tread and deck up to 13" (BOCA National Building Code allows for 9 ½" rise.) The deck edge at the top of the ladder is worn away and needs reinforcement. Chains are used as hand-railings on several of the ladders and do not comprise an adequate handhold for visitors.
To date: Unescorted visitors are no longer permitted on these ladders. Reinforcement repair at deck edge.4C. Recommended further actions:
Photo document and measure existing ladders, label, remove from mounts, and store for safe-keeping.5. DECK LEAKS (Standards p.17)Renovate and repair treads and landings as needed. Install solid handrails as needed.
Continue to investigate appropriate railing system.
Condition 1/96: OLYMPIA suffers from serious rainwater and plumbing leaks throughout the ship. Leaks have been identified coming through the following spaces: the wooden planking on the main and berth decks; through holes and rusted seams on the uptakes, and vents; rusted and deteriorated gun casemates; rusted deck edges; doors and hatches that can no longer seal properly; skylights; leaky plumbing; and sweating scupper pipes.
The original wooden planked deck was covered with concrete to serve as reinforcement while at the Philadelphia Naval Shipyard (Circa 1922-1957) and then coated with a rubberized compound impregnated with asbestos. The deteriorated condition of the deck allows water to pool at low spots causing serious leaking during periods of rain.
Leaks have caused moderate to severe damage from metal corrosion in the following spaces: wing passageways, uptakes, superstructure deck fittings and bulkheads, crew's water closet, berth deck bulkheads, main deck bulkheads, CPO's quarters, entire boiler room, and the inner bottom voids.
Leaks have caused moderate to severe damage from rotting in the following spaces: pilot house, captain's stateroom, admiral's stateroom, flag lieutenant's office, captain's office, wooden main decking, wooden berth decking, CPO's quarters, hammock stowage, and various artifacts on display.
5A. Actions taken to date:
(11/96) Synthetic membrane(Kalbar) applied to all flat stretches of decks by contractor. [Wm. Watts Co.]5B. Recommended further action:
(11/96-present) Staff apply caulking and reinforcement to all edges of membrane at deck structures and boundaries.
(1998-99) Address remaining areas of water infiltration: gun sponsons, skylights, ventilators, radio shack, etc. Funds sought through National Maritime Heritage Grant Program. [by contractor]6. BILGE PUMPS (Standards, p. 17)Note: Flag locker / radio shack (superstructure deck aft) found to be in seriously deteriorated condition (12/96.) Original structure has been sheathed inside and out with modern materials, and extensive rot has been found in both original and later sheathing, resulting in serious leaks to captain’s and admirals quarters. Recommend removal of sheathing and assessment of original. It appears that original is hopelessly rotten, and will need to be documented and removed, followed by extensive deck work to stop water infiltration. Replication of original is an option, though it probably dates from c. 1902. Further assessment required.
Condition 1/96: OLYMPIA has no operative fixed bilge pump system, nor pumping capacity sufficient to deal with catastrophic flooding. Ship is presently reliant exclusively on portable electrical submersible pumps for dewatering. Rainwater has accumulated in levels up to 36" in the inner bottom bilges causing deterioration of shell plating and structural members.
OLYMPIA also encountered major flooding in the winter of 1994 when a hull rivet popped out after abrading against wooden mooring camels (see item 2. Above.) The rivet was at the junction of the armored deck plating with the exterior hull, two feet below the waterline. Coal bunker B-11 filled with enough water to generate a fifteen degree list to starboard, threatening OLYMPIA with capsizing(?). The hole was patched by a damage control team from the Philadelphia Naval Shipyard, and the ship dewatered by a cooperative effort of Navt personnel and the Philadelphia Fire Department.
6A Actions to date:
(6/97) The ship's curator has consulted with T. Perry, Pump Technician with the Navy’s Ship Systems Engineering Station, to determine specific requirements for a system to be installed onboard OLYMPIA, including the number of pumps, the pumping capacities, the possibility of interconnecting the pumps with a manifold, and power requirements.6B Recommended further action:The curator has also consulted with representatives from Phillyship and Goodwin Pump to determine specifications and cost estimates for a dewatering system.
There are 27 voids in the inner bottom of OLYMPIA and the curator is presently investigating the drainage to determine the appropriate number of pumps. Professional consultants will be brought in to specify system and assist with engineering and design.
(2/98) Area of shell plate approx. 24" long, port bow just above WL, discovered to be corroded through. Soft patch applied.
Install effective bilge alarm system. (1998-99)7. LOSS, DAMAGE, AND VANDALISM OF ARTIFACTS
Install effective bilge pump system. (1998-99)
Acquire additional portable pumps for emergency use.
Condition 1/96: Numerous artifacts and items of historic fabric from OLYMPIA are strewn throughout the ship with no identification, tracking system, or secure storage. The items of ship's fabric include a large quantity of wooden furnishings, tools, valve, handles, wooden decking, electrical fittings, nameplates, hatches, and wooden ladders. Three-dimensional and paper artifacts are threatened by water damage, lack of environmental controls, or loss through fire, flooding, or vandalism.
7A. Actions taken to date:
(5/96) The Museum has conducted a survey and working inventory of paper-based artifacts through a visit by Ann Craddock of the Preservation Services Office of the CCAHA. (See appendix) The Museum has also recently (1/98) finished the MAP II Survey to assist in determining artifact management policy. (See appendix)7B. Recommended further action:(10/96) Paper-based artifacts have been removed from OLYMPIA for safe-keeping at the ISM library, per recommendation of Conservation Center.
(1/98) Creation of on-board artifact storage area with steel artifacts cases installed in dry compartment A-100. Transfer and inventory of artifacts begun.
Obtain secure, environmentally stable, off-site storage to house remaining artifacts.8. RAIN DAMAGE - WEATHER DECK (Standards, p.17)
Install additional security alarms as part of the fire-alarm package.
Condition 1/96: On the weather deck, boat winches, skylights, and hammock covers have suffered from exposure. Skylights do have temporary plastic tarps enclosing them during winter months but these tend to be damaged or come loose during strong winds and most are in need of replacement.
Boats: Ship carries four wooden boats on skids above weather deck. These are reported to have come from Cape May, NJ in the early 1960's; at least one appears to be a USN 26' motor whale boat. All four are in seriously deteriorating condition due to exposure to weather. Port forward boat has a broken keel, and threatens to collapse and fall on weather deck. This boat should be dismantled and removed. Other boats (one is covered) should be thoroughly surveyed and evaluated for potential hazards.
8B. Actions taken to date:
(7/97) Three most critical boats have been removed. Fourth has been stabilized. [Staff & Volunteers]8C. Recommended further actions:(1998-99) Museum is gathering estimates for thorough repairs to deck structures, to include caulking, steel patching, reglazing of skylights, and possible dismantling of radio shack. Plans call for completion of this work as funding is obtained.
Long-term remedy for deck leaks will be a result of Phase II rebuild of decks.9. MAINTENANCE PROCEDURES (Standards, p.17)
Condition 1/96: OLYMPIA is manned during daytime hours only and needs regular security inspections to investigate for water accumulation, fire hazards, new leaks, vandalism, and damage. There have been no standardized procedures for regular inspections onboard and many spaces had not been entered at regular intervals.
9A. Actions taken to date:
(6/96) A daily log has been instituted to record ship's list and new accumulations of water in the compartments, as well as significant maintenance activities conducted during the day. The bilges in accessible compartments and wing cofferdams are inspected on a weekly basis by the ship's curator.9B. Recommended further actions:(8/96) Sounding tubes and access for inspection purposes have been identified and made functional
(12/96) Develop and institute a manual of operations including daily and weekly security inspections, formatted checklists, to include inspection of bilges, fire hazards, cofferdams, plumbing, moorings, and general housekeeping.
Develop emergency action plan for specific actions in event of fire (1/98), storm, catastrophic flooding, etc.10. SEWAGE:
Condition 1/96: The only toilets onboard OLYMPIA flush directly into the Delaware River without any treatment which is a violation of water pollution regulations.
10A. Actions taken to date:
(3/96) The toilets were secured from operation when the museum assumed operational control of the OLYMPIA. The staff and workers are currently using toilet facilities at the Independence Seaport Museum, or porta-john installed on pier.10B. Recommended further actions:Events / receptions / meetings / parties are no longer booked on the ship.
Study the feasibility of installing a sewage containment system onboard OLYMPIA connected to existing toilets that can be pumped onto a containment truck. Alternative (preferable): pumping to shoreside sewage connection.11. ADMINISTRATION:
Condition 1/96: Initially, it was hoped that the Museum could maintain the administrative and management structure of the Cruiser OLYMPIA Association, allowing it to operate semi-autonomously. Upon examination of the situation, it became clear that to attempt to do so would only duplicate services, increase costs, and impede efficiency.
11A. Actions taken to date:
(1/96) The Museum formulated and implemented a short-term business plan aimed at streamlining the operation of the ships, reducing costs, and focussing the institution’s resources and efforts on preservation. On board staff were reduced; all business functions were transferred to the Museum (payroll, accounting, etc.); the Museum’s Assistant Director assumed direct supervision and responsibility for the ships; a temporary “shipkeeper / curator” was engaged to oversee day-to-day operations and implement Museum policies; a conscientious effort to reduce unnecessary spending was immediately (and successfully) begun.11B. Recommended further actions:(1/97) Ship was closed for two months to cut costs and make operational changes.
(6/97) Ship is staffed with full-time, permanent shipkeeper / curator who supervises operations, staff, and maintenance.
(1997) With consistent, permanent staff aboard, Museum has invested in safety and preservation training for all staff. Volunteer program is growing dramatically. Visitation is strong, largely due to Museum marketing efforts.
Institute administrative changes in accordance with the recommendations of MAP II.SECTION II: DOCUMENTATION
1. DOCUMENTARY EVIDENCE (Standards pp.19-20)
The Museum needs to locate and study documentary evidence for the accurate preservation, restoration, and interpretation of the OLYMPIA. Even emergency protective measures should not be undertaken without careful research into the history of those parts of the ship impacted.
1A. Actions taken to date:
(3/97) Lists of available plans have been gathered from National Archives (both DC & NE Region), Naval Historical Center, and National Maritime Museum Association. Copies of critical plans have been secured at the Museum. Reproduceable masters have been made, and filed in the Library. Digitizing plans for easier access and reproduction is being researched.1B. Recommended further action:(1/98) Historic American Engineering Record (HAER) Report PA-428 on the OLYMPIA has been completed and published. Author Robert Stewart has conducted and documented extensive research on the ship’s history in archival, plan, and photographic collections at National Archives, Naval Historical Center, and Library of Congress. Excellent bibliography. (See appendix)
(1998-99) ISM intends to build on documentation accomplished to date by completing a Historic Structures Report on the OLYMPIA. This will include: historical research both on board and archival; a comprehensive condition survey; and a detailed plan for preservation and restoration of the ship in Phase II.2. PHOTO AND VIDEO DOCUMENTATION (Standards pp. 19-20)
A photo and video-documentation of the OLYMPIA will provide a fast and relatively effective method of recording the material conditions of the ship and artifacts onboard OLYMPIA.
2A. Actions taken to date:
(1/98) HAER Report includes extensive photo documentation of the ship as found in 1996. Museum staff have carried out selective photo documentation for specific concerns and projects.2B. Recommended further actions:
Historic Structures Report will include a complete photographic record of the ship. ISM is investigating the use of computerized plans, photographs, and database to combine documentation and preservation data in a convenient and accessible electronic format.2. ASSESSMENT AND SURVEYS (Standards pp. 19-20)
1A. Actions taken to date:
Tri-Coastal Marine Preliminary Survey (12/94)SECTION III: STABILIZATION
Mooring Recommendations (6/96)
R. Bardsley, NSWCCD Code 624 Galvanic Corrosion Survey (9/97)
GA Environmental Asbestos Survey (2/96)
AAM / MAP II Preservation Assessment (1/98)
Conservation Center Preservation Overview Survey (5/96)
HABS / HAER HAER Report # PA-428 (1/98)
Plans search (Nat’l Archives, SFNMMA) Staff (97)
Staff & pro-bono consultants Various topics; on-going
NR NAVSEA DET Donation Ship Inspection (7/97)
1. PAINTING AND METAL PRESERVATION (Standards pp.22-23)
Condition 1/96: The entire hull and superstructure deck needs rust removal, priming and painting. The exterior spaces are suffering running rust and severe paint flaking. Many areas have been over painted as well, so that undercoats are beginning to crack. Paint was confirmed as containing lead (5/96.) OLYMPIA's present location at Penn's Landing may preclude proper surface preparation due to environmental restrictions, but at present it appears feasible to paint on site.
1A. Actions taken to date:
(12/97) Using the Keystone Preservation Grant and matching funds raised by ISM, the entire exterior of the ship, above the waterline, was high-pressure water blasted and recoated with a modern paint system. Approximately 32,500 square feet were stripped to either bare metal or effective undercoating; pre-prime and sophisticated modern anti-corrosive coatings applied, and all surfaces were finished with a top coat of maintainable silicon alkyd. Project was carried out in the water within all environmental regulations.2. CATHODIC PROTECTION (Standards, p. 25)
Condition 1/96: The hull below the waterline of OLYMPIA has not been painted or repaired since 1957 and has suffered severe but localized wastage of the steel shell plating and deterioration of the interior structure-bearing members. Some part of this deterioration may be due to galvanic corrosion, which could be brought under control with modern cathodic protection systems. This appears to be an area where there are serious differences of opinion as to effectiveness of particular systems. Careful and extensive research is called for.
2A. Actions taken to date:
(6/96) Electrolytic potential testing of the OLYMPIA's hull carried out by Mr. Bob Bardsley of the NSWC, Carderock Division. Testing results showed a freely corroding hull, but potential readings indicate minimal levels of galvanic action.2B. Recommended further action:The museum is currently studying the feasibility of installing a cathodic protection system onboard OLYMPIA and has consulted with Mr. Bardsley, Mr. William Miller, a cathodic protection engineer from Philadelphia Naval Shipyard Shop 106, and Erik Bonner of Harco Technologies to determine specific protection requirements while the ship is moored at the Penn's Landing Basin.
(1/98) It does not appear at this time that an impressed-current cathodic protection system is a high priority for the stabilization of the ship at this time. The most severely corroded areas of the ship appear to result from wind-water line corrosion, abrasion, or interior leaks. Other measures will do more to address these than a cathodic system.
Conduct a visual hull inspection of hull with a diver or ROV from NSWC.PRESERVATION PLAN: CRUISER OLYMPIAConduct cathodic protection tests on OLYMPIA's hull using portable magnesium anodes.
Install temporary (external) system once there is consensus on need.
(Note: Appendices have not been included in their entirety, due to length. Please contact Independence Seaport Museum for further information).
1. The Secretary of the Interior’s STANDARDS FOR HISTORIC VESSEL PRESERVATION PROJECTS.2. National Register of Historic Places Inventory Form 10-300, Nomination for USS OLYMPIA November 12, 1974.
3. Department of the Navy, Bureau of Ships, Transfer of the USS OLYMPIA, 11 September 1957
4. Tri-Coastal Marine survey of USS OLYMPIA, 5 December, 1995.
5. Asbestos Investigation for the USS OLYMPIA, April 8, 1996.
6. Asbestos Abatement Project Documentation Report for USS OLYMPIA, May 9, 1996.
7. MAP II Collections Management Self-Study Assessment, May 24, 1996.
8. American Association of Museums / MAP II: Collections Management Assessment Survey Report (1/98)
9. Historic American Engineering Record: USS OLYMPIA. HAER No. PA-428 (1/98)
10. Preservation Overview Survey; Conservation Center for Art and Historic Artifacts;
(Paper-based collections; May, 1996)11. Draft Collection Policy for the Cruiser OLYMPIA. (5/96)
12. Tri-Coastal Marine mooring plan recommendations ( 6/96)
13. R. Bardsley: Underwater Hull Corrosion Survey (9/97)
14. NAVSEA: Donation Ship Program - Inspection Report (7/97)