TENNESSEE CONFEDERATE RAILROADS:  NASHVILLE AND CHATTANOOGA


The Nashville and Chattanooga Railroad, incorporated in 1845 and completed in 1854, ran 151 miles from Nashville to Chattanooga, dipping briefly into Alabama just near the latter city.  The N&C was the first major railroad completed in Tennessee, and was the only state-aided railroad to avoid financial loss to the state.  As a major north-south route connecting Middle Tennessee's two major cities, the N&C was destined to play a major strategic role in the upcoming war.  Within its Tennessee trackage, the N&C connected with several associated short lines:  a Shelbyville branch at Wartrace, the McMinnville and Manchester at Tullahoma, the Winchester and Alabama at Decherd, and the Tennessee Coal and Railroad Co. near the Cowan Tunnel just south of Decherd.  At Stevenson, Alabama, the N&C connected with the Memphis and Charleston, thus linking Memphis to Chattanooga (and thence to the Atlantic Coast).

The N&C provides a good example of early railroad construction practices.  The original track consisted of U-pattern rail laid on longitudinal wood stringers (later replaced with T-rail by the U.S. Military Railroad).  The Cowan Tunnel demonstrates remarkable early engineering work.  Begun in 1849 using only black powder blasting and hand tools, construction crews (of English and Irish immigrants, African American slaves, and other local residents) bored the tunnel (along with three vertical ventilation shafts) through 2228 feet of  Cumberland Mountain limestone and shale, completing the project in 1853.

The Confederates fought hard to control the N&C early in the war, but the line eventually fell under Federal control.  Because the N&C was important in supporting the Federal advance on Atlanta, Confederate raiders attempted to disrupt the Federal operations on the N&C later in the war.

   Confederate Railroads  |  Tennessee Civil War Railroads  |  Civil War Technology & Industry in Tennessee

Last updated:  May 2, 2000