![]() |
The Memphis and Charleston Railroad, chartered in 1846, ran eastward from Memphis, a major port city on the Mississippi River, dropped into Mississippi, then extended across northern Alabama, terminating at Stevenson, where it connected with the Nashville and Chattanooga. This major east-west route provided a rail link between Memphis and the Atlantic, thus establishing a strategically significant corridor that would play a major role in the Civil War.
Within its Tennessee trackage, the M&C included a included a branch line at Moscow that ran northward to Somerville, and a junction with the Mississippi Central at Grand Junction. At Corinth, Mississippi, the M&C connected with the Mobile and Ohio, and at Decatur, Alabama, with the Tennessee and Alabama. Consequently, although primarily an east-west route, its interconnections with several north-south rail lines gave the M&C a strong regional influence that far exceeded its primary corridor.
The M&C had enjoyed a rich antebellum heritage long before the Civil War experience. It absorbed Tennessee's first operational railroad, the short-lived LeGrange and Memphis. Upon completion of the M&C in May, 1858, a grand celebration was held at Court Street Wharf in Memphis, where a massive crowd of spectators witnessed the "wedding of the waters," a symbolic pumping of Atlantic Ocean water drawn from Charleston Bay into the Mississippi River, thus signifying the linking of the Mississippi Valley and the Atlantic Coast.
The strategic value of this major east-west rail line was not lost on either Confederate and Federal strategists, and most of the military actions of 1862 (notably the Battle of Shiloh) were fought with control of the railroad as a major concern for both forces. Even after the military focus shifted to Middle Tennessee later in the war, the Federal forces worked hard to keep the M&C open.
Confederate
Railroads | Tennessee Civil War Railroads
| Civil War Technology & Industry
in Tennessee
Last updated: May 2, 2000