CONFEDERATE RAILROADS:  EAST TENNESSEE & GEORGIA



 

The East Tennessee & Georgia Railroad ran 112 miles from Knoxville to Chattanooga.  Chartered in 1848, the original line was completed in 1855, running through Dalton (Georgia) to Chattanooga, but a more direct route between Cleveland and Chattanooga (the "Cleveland Branch" of 27 miles) was completed in 1858.  Construction of the ET&G was difficult due to the mountainous terrain.  Located in eastern Chattanooga, the Missionary Ridge Tunnel (980 feet long) constitutes an impressive example of the engineering work needed to complete the rail line.

Because the ET&G ran through an area with strong Unionist sympathies, there were several railroad bridge burning episodes on this line early in the war (see Railroad-Related Military Events).
 


   Confederate Railroads  |  Tennessee Civil War Railroads  |  Civil War Technology & Industry in Tennessee

Last update:  May 2, 2000