161 Battery deployed in the only open clearing for klicks around - a burial ground. The three guys at left are busy at volleyball. (Feb 1966)
Sunshower, 161 Battery base camp at Bien Hoa. The tents quickly reach saturation point. (Apr 1966)
B Coy 1 RAR approaches a model village in the abandoned Binh Ba plantation - we find it complete with church, and several pissoires down Main Street. (Apr 1966)
Four men from B Coy 1 RAR take a break from patrol. (Apr1966)
Extraction of B Coy 1 RAR at the end of an operation.
|