Page 48
PREPARATION FOR OPERATION
Operate the train from the Cab Car in accordance with railroad operating procedure.
NOTE : Positioning of circuit breakers for freight operation, lead or trail, are shown on the positioning chart above the EC panel. This type of operation must be performed as directed by railroad rules.
ON TO PAGE 49
BACK TO PAGE
47
BACK TO TABLE
of CONTENTS