Page 47
PREPARATION FOR OPERATION
Operate the train in accordance with railroad operating procedure.
PUSH-PASSENGER SERVICE
Before moving the locomotive and train in push-passenger service, proceed as follows :
Move the following circuit breakers on the EC panel to ON position
- Control
- Charging Circuit
- Local Control
- Fuel Pump
- Running Lights (as required)
- End of Train
All other breakers must be in OFF position.
On the control console move the Generator Field Circuit Breaker to OFF position.
Turn on the Red Warning Light switch.
Turn on the Front Class Light switch (also sets the Door Closed Light circuit for Cab Car.)
Make a full service brake application (25 psi brake pipe reduction), then move the brake valve handle to LAP position and remove the handle.
Close the Double Heading Cock.
Depress the handle of the MU-2A valve and move it to TRAIL 24 and 26 position.
Remove the handle of the SA-26 Independent Brake Valve in RELEASE position.
ON TO PAGE 48
BACK TO PAGE
46
BACK TO TABLE
of CONTENTS