DD 837 (Gearing Class)
|
Builder: Bath Iron Works Corpn. Laid Down: January 15,1945 Launched: May 27,1945 Completed: July 31,1945 Commissioned: July 31,1945 Stricken: October 1,1977 Fate: Transferred to Taiwan, "TE YANG, DD-925" |
The Gearing Class as Constructed
Displacement: 2,425 tons (3,460 tons full load) Length: 390 feet 6 inches Beam: 40 feet 10 1/2 inches Draught: 14 feet 4 inches (mean) Machinery: four Babcock & Wilcox boilers; 2-shaft G.E.C. geared turbines Performance: 60,000 shp for 35 knots Bunkerage: 740 tons Range: 4,500 nautical miles at 20 knots Guns: six 5 inch DP; twelve 40 mm; eleven 20 mm Torpedoes: ten 21 inch in two mounts |
|
DD 837 - | - DD 837 |