
Southern Expressway
This expressway has the unique distinction of being the last free expressway to be built in the Pittsburgh area. Construction began on the highway in 1990, which would serve the new Midfield Terminal of Pittsburgh International Airport which was being built simultaneously. PENNDOT faced several challenges while building the new expressway such as subsurface mine fires, inactive landfill areas, hilly terrain, and wetland areas. Not only did natural barriers stand in the way of construction, but also the White Swan Amusement Park. The amusement park which sat in the area of Exit 3 was purchased and demolished to make way for the connection to the Airport Parkway.
The 7.5 mile, $190 million dollar expressway opened in September 1992. One interesting feature of it is the median which was planned with future expansion in mind, whether it be light rail, Maglev, West Busway, or extra lanes.

Route of the Southern Expressway
(Greensburg Tribune-Review)
There had been an expressway devised in the 1963 Pittsburgh transportation plan that would have served the same area. In the plan it was referred to as the Airport Terminal Freeway.
Links:
Exit Guide
PA 60
Southern Expressway Pictures
Airport Terminal Expressway
PA 60 Junction List - Tim Reichard
PA 60 Pictures - Andy Field/Alex Nitzman
Terminus of PA 60
- Adam Prince
INFORMATION |
|
| Southern Terminus: |
Business PA 60 in Robinson. |
| Northern Terminus: |
Business PA 60 in Moon. |
| Length: | 7 miles |
| National Highway System: |
Entire length |
| Name: | Southern Expressway |
| SR Designation: |
SR 0060 |
| County: | Allegheny |
| Multiplexed Routes: |
None |
| Former Designations: |
None |
| Speed Limits: | See exit guide |
| Emergency: | 911 |
![]() Traffic Conditions: |
Airport
to Business PA 60 (Southbound) Business PA 60 to Airport (Northbound) |
| Area Codes: | 412/878 |