Pittsburgh Busway
System
In the mid-1970s, transportation in Pittsburgh was very good. We had a trolley system that could take passengers to all reaches of the metropolitan area, prior to today's subway, the "T." With the energy crises of the 1970s, the Port Authority of Allegheny County decided to extend its service throughout the county. Its first major endeavor was to build a busway to connect the downtown "Golden Triangle" with the South Hills. In 1988, the North Hills Busway was built in conjunction with the construction of Interstate 279 which are otherwise referred to as the HOV Lanes. The map below illustrates the busway routes in red.
|
These roads, except the North
Hills Busway, are not |
South Busway
Martin Luther King Jr./East
Busway
North Hills Expressway HOV
Lanes/North Hills Busway
West Busway/Wabash HOV Facility
Length: 5 miles
Opened in 1978, it serves downtown Pittsburgh, Station Square, and the neighborhoods of the South Hills. It is a bypass of the Liberty Bridge and Tunnel and the traffic that both cause on PA 51 (Saw Mill Run Boulevard). Most bus routes through the South Hills will travel the busway into the city.
STOP GUIDE
TO |
TO GLENBURY |
TRANSFERS |
Glenbury |
E, BM, BR, CL, JL, 46B,
46D, |
|
Overbrook |
||
Inglewood |
||
Central |
||
Whited Street |
||
Edgebrook Avenue |
||
Palm Garden |
||
South Hills Junction |
"T" |
|
Station Square |
"T" |
|
FARE SCHEDULE
Depends on the bus route that you are traveling.
Length: 7 miles
Prior to the opening in 1983, a trip from downtown to Wilkinsburg took 45 minutes. On the average the same trip take 15 minutes. This busway serves downtown Pittsburgh, East End, and the eastern suburbs of Allegheny County. The following stations are served by route EBA-East Busway All Stops, with frequent service to downtown Pittsburgh seven days a week. Route EBO-East Busway Oakland has direct service to Oakland from Wilkinsburg, Homewood, East Liberty, and Negley Avenue Stations Monday through Friday. Route EBX-East Busway Express provides rush-hour service to downtown Pittsburgh from the Wilkinsburg and Homewood Stations only. The average ridership for route using the busway are 30,000 daily.
Recently, there has been talk of the possibility of converting the busway into a subway right-of-way that would serve the eastern suburbs of Allegheny County. Currently, work is underway to extend the busway to the Swissvale/Rankin border. Groundbreaking for this additional 2.3 miles took place in June 1999. This $62.8 million project will include three stations and six park and ride lots. The extension is scheduled to open in June 2003. Project website: http://www.portauthority.org/grow/capital/eastbusway/schedule.asp.
Routes 68X Wilkinsburg - Homewood, EBX-East Busway Express, and W-Wilkins Avenue Flyer do not operate on Saturday, Sunday, New Year's Day, Memorial Day, July 4, Labor Day, Thanksgiving, and Christmas.
STOP GUIDE
TO WILKINSBURG |
TO PITTSBURGH |
LOCATIONS |
TRANSFERS |
Grant Street |
USX Tower |
||
Smithfield Street |
6th Avenue |
||
Liberty Avenue |
10th Street |
||
Downtown Pittsburgh |
Smithfield Street & |
||
Penn Station |
East Busway |
||
Herron Hill Station |
Herron Avenue |
54C | |
Negley Station |
Ellesworth & |
EBO | |
East Liberty Station |
Penn Avenue & |
EBO, 4U, 64A, 71C, 78E, 81B, 86A, 86B, 88A, 89A, 94A, 94B, and 94C | |
Homewood Station |
Hamilton Avenue & Thomas Boulevard |
EBO and 74A | |
Wilkinsburg Station |
Penn Avenue & |
J63A, 63B, 67A, 67C, 67E, 67F, 67J, 68A, 68D, 68F, 68G, 68J, 71C, 79A, 79B, 86A, 86B, 88A, and Maplewood | |
Wilkinsburg |
Hay Street & |
||
FARE SCHEDULE
| CASH FARES Routes EBA, EBX, W, and 68X operate entirely within Zone 1. |
TRANSFERS Valid for three hours in any direction |
SPECIAL FARES Full Fare is paid on weekdays when paying fare between 6-9 AM and 4-6:30 PM |
PASSES AND TICKETS |
Adults |
Adults $.25 |
People with disabilities $.60* |
Weekly Pass $11.00 |
| Children (6-11) $.60 |
Children $.10 |
Senior Citizens FREE* |
Monthly Pass $40.00 |
| Children (5 and under) FREE |
People with disabilities $.10 |
*Must show Medicare ID or a state-issued 1/2 fare card. |
Six Month Pass $200.00 |
| Twelve Month Pass $400.00 | |||
| Tickets (book of 10) $11.50 |
These are the high occupancy vehicle lanes that run in the middle of I-279 and I-579 from Pittsburgh into the North Hills. The lanes were a part of the building of the Parkway North and were opened in 1989. In 1995, an accident between two cars happened which killed six people, because a PENNDOT employee did not close the gates to the outbound entrances. The employee was later convicted of murder. This is the only busway that allows car onto the right-of-way. The busway provides express bus service between downtown and the North Hills. Access to the HOV lanes in from downtown Pittsburgh, the North Shore, McKnight Road, and Perrysville Avenue.
STOP GUIDE
TO |
TO NORTH HILLS |
LOCATIONS |
Showcase Cinemas |
McKnight Road & |
|
North Park Pool |
Hemlock Drive |
|
Perrysville Avenue |
I-279 |
|
Perrysville Avenue |
I-279 |
|
Downtown Pittsburgh |
||
FARE SCHEDULE
Depends on the bus route that you are traveling.
Length: 2 miles
The Port Authority has completed building a fourth busway. The $326.8 million total project will connect downtown Pittsburgh with the western Allegheny County neighborhoods and the Pittsburgh International Airport corridor and eventually utilize the old Wabash Tunnel that goes through Mount Washington. This was the tunnel that was abandoned by the County of Allegheny that was to be used by the SkyBus system, an early form of a monorail. The old Wabash Bridge carried trains over the Monongahela River from downtown to the tunnel. The piers for that bridge still remain at Stanwix Street and at the Gateway Clipper boat docks at Station Square.
The mainline busway runs between Pittsburgh and the Borough of Carnegie, with a connection to West Carson Street and the Parkway West. Direct access to Carnegie, Crafton, East Carnegie, Ingram, and Sheraden is provided. The busway reduces travel times by avoiding the congestion on the Penn-Lincoln Parkway.
|
The most challenging aspect of the project was the refurbishing of the 148 year old Barry Street Tunnel, a former rail tunnel, that carry the buses between Sheraden and Ingram. The restoration began in December 1995 and lasted until 1997 at a cost of $33.3 million. Some of the work that took place was widening the tunnel to accommodate two lanes of traffic, excavating the existing brick lining, and installing tunnel lighting, ventilation, fire protection, and drainage. |
On September 8, 2000 the first segment from Carnegie to the Corliss Flyover opened. With the opening came a new bus route: 100 West Busway. No personal vehicles can use this highway; however, it will be open to emergency vehicles. Buses using the new route can cut 26 minutes off the same trip via the Parkway.
Another part of the project is the renovation of the Wabash Tunnel. The 1.1 mile tunnel, which runs between PA 51 and Station Square, has been reconstructed at a cost of $3 million to accommodate two lanes of traffic. It was built at the turn of the century to carry the Wabash Railroad through Mt. Washington to its terminal in downtown Pittsburgh.
Most of the discussion of this project lies in the alignment of the new bridge. Some of the proposals have the bridge coming into Pittsburgh above the current street grid. A plan that former mayor Sophie Masloff liked was to have the bridge meet Stanwix using the current piers and would also call for the lowering of the Parkway Central's eastbound lanes. All traffic will be able to use the bridge, which would have connections with downtown, Carson Street, and the Wabash HOV facility.
Since the fall of 1994 when the project began, 70% of the mainline has been completed. Construction of busway ramps connecting to the Parkway West near Carnegie and Rosslyn Farms began in mid-1998. The Corliss Flyover, which will connect the busway to West Carson Street, began in March 1999. Construction of the mainline will be completed in December 2000 when the Parkway West interchange and Corliss Flyover are completed. The entire project was proposed to be operational by April 2001. Project website: http://busway.dickinfolink.com/.
Links:
Monongahela
River Bridge
West
Busway
Telephone: (412)
442-2000
7 AM - 7 PM Monday - Friday
8 AM - 6 PM weekends and holidays
TTY users: (412) 231-7007
PAT Service Center: 534 Smithfield Street at Mellon Square downtown
Open Monday - Friday 7:30 AM - 5 PM
Address: 2235 Beaver Avenue, Pittsburgh, PA 15233-1080
Web Page: http://www.portauthority.org/