PA 28
Allegheny Valley Expressway
Alexander H. Lindsay Highway


This expressway has its beginnings all the way back in 1910 when there were hardly enough cars to warrant a high-capacity highway.  It was in that year that a Pittsburgh transportation plan recommended widening and paving East Ohio Street from the North Side through Millvale, Etna, Sharpsburg, and Aspinwall.  The work did not begin until 1921, which involved moving St. Nicholas Roman Catholic Church farther back onto a new foundation.   In 1939, another transportation plan recommended construction of the Etna-Sharpsburg Bypass to "urban freeway standards."  It would not open to traffic until 1957.  Also in that same year, construction began from East Ohio Street to Blawnox.

In 1963, this section opened to traffic from PA 8 north to the Highland Park Bridge interchange and the following year to Blawnox.

Drawing of proposed PA 28/PA 8 interchange
Drawing of proposed PA 28/PA 8 interchange in Etna from 1952.
(Paul Slantis)

Also in 1963, the Pittsburgh Area Transportation Plan recommended upgrading PA 28 and then PA 8, to a six-lane, limited-access highway starting 2,200 feet west of the 31st Street Bridge and ending at the 40th Street Bridge.  Full interchanges would be constructed at both bridges; however, this recommendation was not carried out.  It also laid out a plan that would turn PA 28 into an expressway from Pittsburgh to Brookville, this too was not carried out.

In 1968, construction began on the section from Blawnox to PA 910.  The expressway was proposed from that point to the Butler County line.  Construction also began on the section from Slate Lick to near Center Hill in the same year.  In 1969, construction commenced on the section from PA 910 to Exit 12 and from Exit 16 to PA 356 and the Armstrong County line.

The start of the 1970s saw the construction extend from Exit 16 all the way to a new expressway alignment for US 422, also under construction, near West Kittanning.  In 1971, construction commenced on the section from Exit 15 to Exit 16.  In 1972, the expressway opened to traffic from Blawnox to PA 910 and from Exit 15 to US 422.  However, PA 28's designation was not placed on the section from Exit 15 to Exit 16.  The following year, the expressway opened from PA 910 to Exit 12.  In 1975, construction commenced on the section from Exit 12 to north of Tarentum; and during the following year, the construction was extended to Exit 15.  In 1978, the PA 28 designation was routed onto the newly opened highway from Exit 11 to Exit 12 and from Exit 15 to Exit 16.  The PA 28 designation still followed Freeport Road to connect between Exit 12 and Exit 15.

In 1980, the expressway opened from Exit 12 to Exit 13 and that designation was moved onto this section.  In 1984, a "Priority Highway System Plan" was proposed by the Southwestern Regional Planning Commission.  It called for building an interchange "with Route 28 depressed below the 31st Street Bridge," and the permanent closing of Rialto Street.  However, this plan was ignored just as it had been when first proposed in 1963.  Even with the recommendation being turned down, it was time to celebrate the opening of the final section between Exit 13 and Exit 15 in 1985.

The first section of the expressway to see a rehabilitation was the infamous "death stretch" that extended from Millvale to Etna.  Statistics showed that this section saw 169 accidents occurred from 1982 through 1987.  Ninety-six of them involved injuries and four involved one or more fatalities.  Construction began on September 6, 1988, and involved blasting 600,000 cubic yards of rock from the hillside that parallels the highway to reduce slides, widening the lanes to 12 feet each, adding 10 foot-wide shoulders, adding should pull-off areas such as on the Parkway East, and placing a Jersey barrier in the middle of the four foot median.  The Etna interchange received new lights and signage.  The $14.4 million project that required four lanes of traffic to squeeze into two finally came to an end December 7, 1990, due to rain hampering construction.  Glare screen was erected on the Jersey barrier in 1991 to cut down on the effects of headlights from oncoming traffic.  One final touch to this section was the addition of lighting.  A little unconventional due to the placement in the median instead of the outside due to the narrow right-of-way, the lights came on-line in 1995.  The conduit and foundations had been installed during the rehabilitation project.  The standards were not installed then because of financial limitations and uncertainty over who would pay for the electric bill.

In 1994, the year's Long Range Transportation Plan proposed widening the highway to 54 feet between Troy Hill Road and the 40th Street Bridge.  State representative Don Walko commented on the lackluster performance of accomplishing this task by saying, "It's a failure of leadership going back many years.  By completing other parts of the expressway northeast of the city and the interstates [I-279 and I-579] without dealing with tough issues on Route 28, we've created the missing link, a terrible bottleneck."

With all of the improvements there remains a two-mile section from the Heinz plant to the 40th Street Bridge which is a thorn in the side of many drivers, earning the name "missing link."  If PENNDOT and the politicians do not work together this time to get the project completed, engineers warn that traffic around the 31st Street Bridge will increase to 90,000 vehicles a day.  Speed will drop to an incredible one mile an hour by 2020, which is a snail's pace by any urban standard.

Many people ask, "So what is taking forever to get this done?"  The answer to that question is answered by Troy Hill Citizens, Inc. chair Cecelia Gavran.  "Every time a politician comes up with another priority, money set aside for Route 28 goes somewhere else.  We don't have a [Kevin] McClatchy or a [Dan] Rooney to help us.  It's not what you know, it's who you know."

If anyone knows the value of this project, it is the residents who call Troy Hill home.  The neighborhood sits on a hilltop across from the PA 28-31st Street Bridge intersection.  It is the confluence where too much traffic and too little "green time" to go around on the signals causes 60,000 to 70,000 vehicles to idle a day at the intersection.  Gavran went on to say, "The bureaucrats say 'stadium' and one year later we see a stadium going up.  They re-examine and re-examine Route 28, but nothing gets done.  It's a project that politicians kick around.  Now they tell us we'll see action within three years.  If we do, I'll eat a copy of the Sunday P-G."

A cardboard box filled with paperwork at the PENNDOT District 11 office in Bridgeville leads Gavran to believe she will never see construction crews rebuilding PA 28.  While there have been plans on the drawing board in the past, nothing has been done with them. PENNDOT officials say that plans are on track to widen PA 28 and replace the signalized intersections at the 31st Street and 40th Street Bridges with grade-separated interchanges.

Other characteristics of the highway are narrow lanes, speeding, congestion, no shoulders, and poor lighting, which resemble the infamous "death stretch" from Millvale to Etna where 26 fatal accidents occurred in as many years.  In the section under study, there have been 198 accidents between 1991 and 1995, which is more than double the state average.  Out of those 198, five resulted in fatalities.

Map of the area to be rebuilt
Map of the section to be rebuilt and sketch of the new highway
configuration.  (Pittsburgh Post-Gazette)

Bill Gibson, the PENNDOT engineer overseeing the PA 28 progress, provides hope that the project will be completed this time around.  "We're in step six of a ten-step, federally mandated process leading to project approval," said Gibson.  "We're working in a very tight corridor, with the river and the railroad on one side, the hillside on the other side and numerous historical, environmental and relocation questions to address."  The $110 million project included the following aspects:

Work is projected to begin late in 2004, which will consist of nine phases in order to maintain two lanes of traffic in both directions.  The new expressway is expected to open in mid-2009.  This plan was shelved.

A major project that got underway in 2001 was the resurfacing of the highway between Exit 6 and Exit 10.  The $13 million project started on March 12, 2001, and entailed patching potholes and laying new concrete.  The first rush hour had traffic crawling along at five to ten miles an hour, with backups from two miles south of the Highland Park Bridge to R.I.D.C Park.  Some drivers honked their horns and banged on steering wheels.  One driver even threw an apple core at an orange construction barrel.  The $12.5 million project concluded on September 20, 2001.

Another project that has been going on at the same time is the reconstruction of the PA 28/PA 8 interchange.  When originally built, the overpasses for the Allegheny Valley Expressway were built for only one lane of travel.  On August 16, 1999, the off-ramp to PA 8 northbound from PA 28 southbound was closed to rebuild it for a total of $4.7 million.  The ramp was lengthened and the hillside next to it was excavated to lessen the threat of falling rocks.  The ramp reopened on January 11, 2000. 

The next step of the project was the demolition of the PA 28 southbound overpass and the widening the support pillars for a two-lane wide ramp which started on April 10, 2001, was scheduled to be completed by Thanksgiving 2001.  However, the company supplying the steel for the bridge deck went bankrupt and forced the contractor to find another source.  The new $11.5 million southbound bridge opened to traffic on December 10, 2001.

Since Saint Nicholas Church is a major stumbling block for upgrading East Ohio Street to an expressway, new plans were laid out on July 14, 2003.  The new PA 28 would be an elevated, six-lane expressway about 30 feet above the current alignment.  A modification to this plan would rebuild the current roadway, impose a speed limit of 40 MPH, and give the church a five-foot-wide sidewalk in the front.  Both plans would include diamond interchanges at the 31st Street and 40th Street Bridges.  "If the 31st Street and 40th Street bridges weren't there, this would be a piece of cake," PENNDOT Planning Engineer Todd Kravits said.  Price tag for this project would range from $160 million to $200 million and would not start before 2008.  A separate project to eliminate traffic lights between Chestnut and East Streets is not factored into this estimate.  Both plans have the same guidelines:

The plans would also include Saint Nicholas and the Millvale Industrial Park receiving service roads from existing streets.  The church would also receive a new parking lot.  The elevated roadway proposal was a modification of an idea by a retired civil engineering professor, Dr. George White, who chairs the Pittsburgh History and Landmarks Foundation's transportation committee.

Map of the area to be rebuilt
The newest plan for the reconstruction of PA 28 and how it would
look afterwards.  (Pittsburgh Post-Gazette)

His plan had the northbound lanes being built over the Norfolk Southern Railroad tracks, which parallel East Ohio Street, and retaining a section of the street for local access.  Dr. White said, "PENNDOT's bulldozer solution does not make sense.  The air rights over the tracks present a handsome opportunity for an elevated highway that solves all of the problems of Route 28 without an ugly, two-mile retaining wall, undercutting foundations and taking the church."  PENNDOT engineers said of the proposal that "bubbling out" the northbound lanes where he suggested would tack on an additional $40 million.

Rock falls are still a problem for the expressway between the RIDC Park and Harmar interchanges.  On July 24, 2003, an estimated 400 tons of rock and debris fell from the infamous cliff and onto PA 28, causing PENNDOT to reduce the roadway to one lane southbound.  The only thing that can be done is create a "drop zone," where it can fall safely to the ground.  Other proposals, such as installing chain-link fencing to hold back the debris, has been dismissed as impractical or too expensive.

The next chapter in the saga of the PA 8 interchange reconstruction will begin around March 1, 2004.  Just as commuters were getting used to not seeing construction on the expressway, PENNDOT will continue its improvements.  The through lanes of the Allegheny Valley Expressway will be rebuilt with the ramps from PA 8 being realigned.  The $26.5 million project should finish by November 20, 2004 or Trumbull Corporation will be forced to pay a $30,000-a-day penalty.  Before that begins, a water line has to be relocated and a 1,000-foot-long retaining wall be built below the PA 28 grade.  For a recap of the construction, and future construction, see the PA 28/PA 8 Interchange Reconstruction page.

A fiery accident occurred on the expressway on November 19, 2003, when a Jeep traveling southbound crossed the median and slammed into a Winnebago traveling northbound around 1:30 PM.  The driver of the RV managed to walk away from the wreck, but the driver of the SUV died at the scene.  The accident occurred in the Aspinwall area.

Aerial picture of the accident scene
Aerial picture of the accident scene.  (KDKA-TV)

PA 28
Allegheny Valley Expressway


In the 1963 Pittsburgh Area Transportation Plan, provisions were made to build this expressway all the way to the then proposed Interstate 80 near Brookville.  Aside from the grading that took place at the former end at Kittanning, no other work was ever performed on this unbuilt section and the plan axed in the 1970s.  Interchanges would have been built at the following locations:

  • US 422
  • PA 85
  • PA 66
  • PA 28
  • Interstate 80

There have been reports that PENNDOT is interesting in studying an extension to I-80, and it made the 2015 Long Range Transportation Plan.  The Allegheny Valley Expressway Extension would be a four-lane expressway extending 17.5 miles to financed and built by the Pennsylvania Turnpike Commission.  This extension is listed under Subsequent Extension Authorizations in the Pennsylvania Turnpike section of Pennsylvania Statutes.  If built, this would become PA Turnpike 28.

Links:
Allegheny Valley Expressway Pictures
Exit Guide
PA 28
PA 28 Junction List - Tim Reichard
Terminus of PA 28 - Adam Prince


Information INFORMATION
Southern
Terminus:
40th Street in Pittsburgh.
Northern
Terminus:
US 422 in West Kittanning.
Length: 36 miles
National
Highway
System:
Entire length
Names: Alexander H. Lindsay Highway
Allegheny Valley Expressway
SR
Designation:
SR 0028
Counties: Allegheny, Butler, and Armstrong
Multiplexed
Routes:
US 422:  West Kittanning to Kittanning
PA 66:  Garretts Run to Green Acres 
Former
Designations:
None
Blue Belt
Pittsburgh
Belt System:
Exit 3 to Exit 6
Green Belt
Pittsburgh
Belt System:
Exit 6 to Exit 8
Speed Limits: See exit guide
Emergency: 911
Traffic.com
Traffic Conditions:
PA Turnpike - downtown (Southbound)
Downtown - PA Turnpike (Northbound)
Area Codes: 412/878:  Allegheny County
724/878:  Allegheny County line to US 422

Back to Pittsburgh Highways
Back to Pittsburgh Expressway System
Page updated January 29, 2004.
Content and graphics, unless otherwise noted, copyright © Jeffrey J. Kitsko. All rights reserved.
Information sign courtesy of Richard C. Moeur.
Pennsylvania shield courtesy of James Lin.
Pittsburgh Belt System shields courtesy of Bruce Cridlebaugh.
Traffic.com logo courtesy of Traffic.com.
Information courtesy of the Pennsylvania Department of Transportation, the Pittsburgh Post-Gazette, the Pittsburgh Press, the Carnegie Library Photographic Archives, WTAE-TV, KDKA-TV, and "2015 Long Range Transportation Plan-A Region on the Move:  A Transportation Investment Strategy for Growth and Renewal in Southwestern Pennsylvania."