One of the qualities that keeps this highway unique from other US highways in Pennsylvania is that this one is missing a piece.  US 422 may be on either side of the state, but it is non-existent from Ebensburg to Hershey where the two ends are located.  At no time was the two sections ever joined to from a contiguous route.

In the early days of the highway, it traveled through New Castle on State Street, Grant Avenue, Jefferson Street, Washington Street, and Butler Avenue before heading to the namesake of that avenue.  In Butler, the route was Cunningham Street, Jefferson Street, and Kittanning Street before leaving to head to Kittanning.  There it traveled on Main Street and South Water Street and then headed onto Indiana where it traveled through the town on Philadelphia Street before leaving for Ebensburg.

On the other side of Pennsylvania, US 422 began near Hershey and traveled through Lebanon on Cumberland Street before heading to Reading on Penn Avenue, Penn Street, Perkiomen Avenue, and Mineral Spring Road.  In Pottstown, it followed Philadelphia and Reading Pike, and High Street before going on to Norristown where it followed Airy Street, Sandy Street, and Sandy Hill Road.  From there, it was onto the largest city in Pennsylvania where it followed Germantown Pike and then Ridge Avenue to end in at US 309 in Manayunk.

The eastern section came about in pieces.  The first section to be signed as US 422 was from Reading to Philadelphia in 1927 when US 120 was truncated at Lock Haven.  The next segment to be signed was from Hershey to Reading in 1932.

The original routing of the highway was much different from what it is today.  From New Castle, US 422 used to head to US 19 and was multiplexed with it to Portersville.  From there it ran through Prospect to Butler, and then through Coyleville and Walkchalk.  After Kittanning, it headed southeast though Heilman and onto Indiana.  From there it traveled to Belsann where it turned south to Twin Rocks then to Nanty Glo and straight to intersect with US 22 southeast of Ebensburg.  In the eastern part of the state, US 422 ran through such towns as Reading, Baumstown, Pottstown, Collegeville, and Norristown.

In 1929, this highway as with many others at the time, had parts that were unimproved and some that were still being built.  From Kittanning to Elderton, Penn Run to Belsann, and Nanty Glo to US 22, the highway was unimproved.  From Indiana to near Penn Run, US 422 was still being built.

In the 1930s, the highway began to see changes to improve its quality.  In 1930, the designation was changed to head straight to Ebensburg, instead of the route through Nanty Glo.  In early 1930s, the western terminus of the eastern section was moved to Harrisburg at US 22 on Walnut Street right at the Capitol Complex.  The route it took in the city was 4th Street, Mulberry Street, and Derry Street.  In 1936, the terminus was moved once again to the corner of Front and Market Street in Harrisburg.  The new route it took out of Harrisburg was changed to Front Street and Paxton Street.  The highway saw a lot of widening occur in 1939.  The sections that saw this work was from west of New Castle to the town, Harrisburg to Hummelstown, Dauphin County line to Lebanon, Sinking Spring to West Reading, and Pottstown to Norristown.  

The 1940s began with widening taking place from PA 68 to Butler and Kittanning to five miles to the east of town, Lawrence County line to Portersville, at PA 328, near PA 68 west of Butler, in Hershey, in Myerstown, in Womelsdorf, in Robesonia, Baumstown to Douglasville, and Stowe to Pottstown all be widened.  The following year the sections from Lebanon to Myerstown, four miles outside of Stouchsburg to the town, Reading to Baumstown, and Douglasville to Stowe were widened.  In 1945, the route changed to follow Germantown Pike, Germantown Avenue, Chew Street, Olney Avenue, Tabor Street, Roosevelt Boulevard, and Levick Street to end at the Tacony-Palmyra Bridge in Tacony.  It replaced the Bypass US 422 designation that had be on that route from Barren Hill to Tacony.  Also in 1945, the highway was placed on a new alignment between the Ohio state line to New Castle and in town it was moved to Sampson Street.  In 1947, US 422 was widened from Myerstown to Stouchsburg, Wernersville to Sinking Spring, right outside of Philadelphia County, and even the bridge over the Allegheny River at Kittanning was widened.  In 1948, construction began on a new alignment from US 19 to Mt. Chestnut.  The following year, the highway was widened from Robesonia to Wernersville.

The first year of the 1950s saw the opening of the new section from US 19 to Mt. Chestnut, while work began on a new section from New Castle to US 19 and in the east from Stouchsburg to Womelsdorf.  The following year those two sections opened to traffic.  In 1952, the highway was widened from Mt. Chestnut to PA 68 and from Hummelstown to the Lebanon County line.  In that same year, US 422 replaced its auxiliary route Bypass US 422 in New Castle.  The new route through the city followed Jefferson Street, Grove Street, Neal Street, and Taylor Street.  In 1953, work began to bypass the town of Hummelstown, with the new section opening a year later.  The corridor continued to see widening work in 1954, with a section west of Indiana seeing improvements.  In the same year, the designation was changed to follow Germantown Avenue, Washington Lane, Wayne Avenue, and Clarrisa Avenue to end at US 1 and US 13 in Hunting Park.  In 1955, the highway was widened near East Butler and from west of Nolo to Strongstown.  In 1956, two sections saw work taking place:  widening on a section west of Indiana, and construction taking place on a new alignment to the south of Coyleville.  Also, the designation was changed to follow Cunningham Street and McKean Street for eastbound traffic.

The new alignment to the south of Coyleville opened to traffic in 1958, with widening taking place from PA 553 to Pikes Peak.  Other projects to take place that year involved dividing the highway at the following locations:  at the US 19 intersection, east of Butler to west of Worthington, east of Pikes Peak, Paxtang to Hershey, in Womelsdorf, and from Baumtown to the Montgomery County line.  That year also saw a movement of the designation in Reading with US 422 eastbound now on Perkiomen Avenue and westbound traffic on Mineral Spring Road.  Work began on a new alignment with the upgrading of Warren Street in northern Reading beginning in 1958.  In 1959, the highway was widened from Pikes Peak to Nolo, and the designation was moved in Philadelphia again.  This time with Alternate US 422, which placed its terminus at Hunting Park Avenue in Philadelphia.

The 1960s began with two projects getting underway in Butler County:  the Butler Bypass and a new alignment south of Worthington and Walkchalk.  On the eastern side of the state, the Warren Street Bypass opened to traffic.  In Lebanon, the eastbound direction of travel was moved to 12th Street, Walnut Street, and Lincoln Avenue.  In 1961, the bypass opened from PA 8 to the US 422 alignment east of town and the new alignment south or Worthington and Walkchalk.  The termini on each section also changed, with the westerns section's eastern terminus now moved to US 22 on the eastern side of Ebensburg.  On the eastern section, the western terminus was moved to US 322 outside of Hershey.

US 422 eastbound at the eastern section's eastern terminus
Looking eastbound at the eastern section's beginning near Hershey.
(Alex Nitzman)
 
US 422 westbound at the eastern section's western terminus
Westbound at the eastern section was truncated here in 1961.
(Alex Nitzman)

Again, the designation moved once again in Philadelphia, with US 422 and Alternate US 422 flipping routes.  That time the eastern terminus was moved back to Hunting Park where it had been prior to 1958.  Also in 1961, work began on the Reading Bypass from PA 10 to the US 422 alignment east of town.  In 1962, the designation was moved to 12th Street for eastbound traffic in Lebanon.  On the western side of the state, the new alignment opened to traffic from Worthington to West Kittanning.  In 1963, both the Reading and Butler Bypasses opened from Mt. Chestnut to PA 8 and from I-176 to US 422 east of town respectively.  Work began on the section of the Reading Bypass from PA 10 to Penn Avenue that same year.  In 1964, the expressway opened from the Warren Street Bypass all the way to east of Reading, and with that, the US 422 designation was moved onto both expressways.

The following year, work began on a new expressway alignment from south of Stowe to east of Sanatoga.  Work also began in 1965 on what would become a part of US 422 in Valley Forge, from Trooper Road to US 202.  In 1966, the designation was moved onto Germantown Pike to enter Philadelphia and work began on a new expressway alignment from two miles east of Interstate 79 to Prospect.  In 1967, two sections of expressway opened to traffic:  Pottstown Bypass from east of Douglasville to east of Sanatoga, and from Trooper Road to US 202.  The latter section was initially designated PA 363 and called the County Line Expressway.  In 1968, the expressway from I-79 to Prospect opened while work commenced on a new expressway alignment from PA 954 to PA 553 in Indiana County.  The 1960s ended with work beginning on the New Castle Bypass from PA 168 to US 422 east of town.

Work was extended on the New Castle Bypass, in 1970, to US 224.  That same year, construction started on the Kittanning Bypass from US 422 west of West Kittanning to near Applewood.  At the same time, the expressway segment from PA 954 to PA 533 opened, with construction beginning on the western end to US 119 and the eastern end to Pikes Peak.  With the opening of the segment, the US 422 was routed up what is now PA 954 to head around Indiana on current Business US 422 to Claypoole Heights.  In 1971, the New Castle Bypass from PA 168 to US 422 east of town, and the new expressway alignment from PA 553 to Pikes Peak both opened.  Construction began that year on the bridge that would carry the new US 422 expressway across the Allegheny River and a segment to PA 66 in Kittanning.  The interesting note in that, is the official state map indicated the alignment under construction to US 422 east of the town, which would not happen for another 28 years.

Kittanning Bypass in 1971
The Kittanning Bypass as indicated in 1971.
(PENNDOT)

Also in 1971, the designation was extended along East Walnut Street in Lebanon.  In 1972, work began on the New Castle Bypass from US 224 to US 422, and while work was starting there, it was finishing on the new expressway alignment in Indiana County.  The expressway segment from US 119 to Pikes Peak was now complete, and with that the designation was moved to follow US 119 to the Wayne Avenue exit then north to Ben Avon and onto Claypoole Heights.  On the western end of the expressway, a piece of expressway was left in anticipation of an extension westward, which would not happen until the 1990s.  Also opening that year was a section of the Kittanning Bypass from west of West Kittanning to the Allegheny Valley Expressway.  In 1973, the New Castle Bypass opened to US 224, but was still being completed north to the US 422 interchange.  However, the designation which had been placed on the completed section, left the expressway at US 224 and traveled west and then north to the alignment to keep continuity.  Work to upgrade Warren Street in Reading to an expressway, in 1974, from Penn Avenue to the section north of the US 422 interchange that years before had been upgraded.

Finally in 1975, the last segment of the New Castle Bypass opened to US 422 and with that the designation was moved onto it from the local highway it had been on temporarily.  In that same year, construction began on the final link on the expressway upgrade in Montgomery County from Sanatago to Trooper Road in Valley Forge.  The year the United State celebrated its 200th birthday, is the same year the people celebrated the Warren Street upgrade completion.  With this opening, US 422 was now a complete expressway from West Reading to east of Reading.  In 1978, the Montgomery County expressway section opened from Linfield to PA 29.

The 1980s saw the conclusion of the expressway construction projects began in the decade before.  In 1982, the Kittanning Bypass opened from the Allegheny Valley Expressway to PA 66, and with that the designation was moved to this new alignment.  While this section was opening, another section was just beginning from PA 29 to PA 363.  In 1984, the expressway from Oaks to PA 363 opened, while work commenced on the section from Sanatoga to Linfield.  Also in that year, a committee was formed by State Representative Henry Livengood to ensure that the missing segment from PA 66 to the alignment east of Kittanning would be completed.  The A-15 Ex-Way By-pass Committee was formed with the goal of having this section added to PENNDOT's 12-Year Program.  In 1985, the expressway's remaining sections opened and a historic change took place.  US 422's eastern terminus in Philadelphia had now been moved completely out of the city limits to the US 202 expressway in King of Prussia.  With the move, the highway's eastern section lost approximately ten miles of length.  If PENNDOT had not trade-in funds from the unbuilt I-895 project, these last two sections might not have been completed.

 US 422 eastbound at the eastern section's eastern terminus
The eastern section's terminus in King of Prussia at the US 202
expressway.  (Alex Nitzman)

The 1990s were a quiet time on the highway.  In 1993, construction began on the expressway alignment south of Indiana from PA 286 to US 119.  Also in that same year, the western section's eastern terminus was moved to the interchange with US 219 west of town.

US 422 eastbound at the western section's eastern terminus
The western section's eastern terminus outside of Ebensburg.
 
The end US 422 assembly
The actual "END US 422" assembly at the terminus.

In 1995, the southern Indiana bypass opened to traffic, which now gave purpose to that unused segment that was constructed with the original section in the 1970s.  That would not be the last missing link to be corrected in that decade.  In fall 1997, environmental clearance was granted by the Federal Highway Administration on the proposed and never built section of expressway from PA 66 to east of Kittanning.  The groundbreaking ceremony took place on March 24, 2000 at 11:30 AM.

The project cost $39 million and opened on December 13, 2001.  Officials from state and local agencies as well as PENNDOT and Federal Highway Administration officials cut the ribbon signaling the opening of the highway.  "This is truly a monumental day for Armstrong County and it is a great pleasure for me to share in this celebrated opening of the A-15 Kittanning Bypass with you," said Pennsylvania Secretary of Transportation Bradley L. Mallory. "It is days like today that make this job worthwhile. And sharing these moments with hardworking Americans like the people of Armstrong County reminds me of why this country is great."

PennDOTPENNDOT Emergency Routing Maps
Montgomery County

US 422 Emergency Detours

Links:
Exit Guide
US 422 Auxiliary Routes
US 422 Pictures
US 422 Expressway
Beaver Valley Expressway
Terminus of US 422 (Eastern Segment) - Dale Sanderson
Terminus of US 422 (Western Segment) - Dale Sanderson
US 422 Expressway - Steve Anderson
US 422 Junction List (Eastern) - Tim Reichard
US 422 Junction List (Western) - Tim Reichard
US 422 Pictures - Andy Field/Alex Nitzman


Information INFORMATION - Western Section
Western
Entrance:
Ohio State line near New Bedford.
Eastern
Terminus:
US 219 one mile west of Ebensburg.
Length: 115 miles
National
Highway
System:
Entire length
Name: Benjamin Franklin Highway
SR
Designation:
SR 0422
Counties: Lawrence, Butler, Armstrong, Indiana, and Cambria
Expressway: PA 60 north to west of New Castle
Moraine State Park to PA 528 near Prospect
Mount Chestnut to east of Butler (Butler Bypass)
West of West Kittanning to Business US 422 east of Kittanning
Business US 422 west of Indiana to Pikes Peak
Multiplexed
Routes:
PA 60:  Business US 422 to PA Turnpike 60 south
PA 28:  West Kittanning to Kittanning
PA 66:  Manorville to Kittanning
Truck PA 286:  PA 286 to US 119 north
PA 56:  Shelocta to US 119 south
PA 271:  Belsano
Former
Designations:
PA 33  (1927 - 1928):  Kittanning to Ebensburg
Washington's Trail
Washington's
Trail:
West Park Road to PA 528
Area Codes: 724/878:  Ohio state line to the Cambria county line
814:  Cambria county line to US 219
Information INFORMATION - Eastern Section
Western
Terminus:
US 322 two miles west of Hershey.
Eastern
Terminus:
US 202 near New Centerville.
Length: 85 miles
National
Highway
System:
Entire length
Name: Benjamin Franklin Highway
SR
Designations:
SR 0422
SR 0222:  PA 12 to Business US 222
Counties: Dauphin, Lebanon, Berks, Montgomery, and Chester
Expressway: West Lawn to Lorane
East of Douglassville to US 202 in King of Prussia
Multiplexed
Routes:
PA 741:  Hershey
US 222:  PA 12 north to Business US 222
Former
Designations:
US 22  (1926 - 1932):  Hershey to Reading
US 120  (1926 - 1927):  Reading to Philadelphia
PA 13  (1926 - 1927):  Reading to Philadelphia
PA 363  (1967 - 1985):  Trooper Road to US 202
SmarTraveler
Traffic Conditions:
PA 100 - US 202
#211/215-567 - 5678
Area Codes: 717:  US 322 to the Berks county line
610/484/835:  Berks county line to US 202

Back to Pennsylvania Highways
Back to Pennsylvania United States Highways
Page updated March 23, 2004.
Content and graphics, unless otherwise noted, copyright © Jeffrey J. Kitsko. All rights reserved.
Information sign and US shield courtesy of Richard C. Moeur.
Washington's Trail shield courtesy of Bruce Cridlebaugh.
SmarTraveler logo courtesy of SmartRoute Systems.
Information courtesy of the Pennsylvania Department of Transportation, Rand McNally, H. M. Gousha, and Steve Anderson.