US 222


The routing of the original US 222 was much different than that of today.  In Lancaster, the highway followed Prince Street and East King Street to follow current PA 340 and turn north to Mechanicsburg and Ephrata.  In Reading, it followed Lancaster Avenue, Bingaman Street, and 5th Street to meet then US 120 and US 22 at Penn Street.  In Allentown, US 222 followed Hamilton Street, 15th Street, to end at US 22 at Tilghman Street.

In 1929, the highway was under construction from Shillington to Reading.  This work finished one year later.  Also in 1929, the designation was extended south from Lancaster to Maryland.

In the first year of the 1930s, the designation was routed onto PA 23 to Mechanicsburg and then northeast to Brownstown.  In 1932, the designation supplanted US 22 from Reading to Allentown.  In 1936, US 222 was rerouted in Lancaster, and was placed on Liberty Street, Lititz Avenue, and Oregon Pike.  Two widening projects took place on US 222 in 1938:  north of Lancaster and from Maiden Creek to Trexlertown.  In 1939, widening continued on the alignment in Adamstown, Reading to Temple, and Wescoesville to Allentown.

As with many other highway projects, the onslaught of World War II brought work on US 222 to and end.  Not until 1945 would improvements begin again on the highway.  In that year the highway was widened from Trexlertown to Allentown and Temple to Maiden Creek.  Also in 1945, a new bypass of Ephrata was opened to traffic.  In 1947, the highway was widened in Shillington.

The 1950s saw many changes take place along the highway.  Construction began on the first section of expressway that would eventually become US 222 in 1951 in Lancaster.  This was originally construction to upgrade then US 230, but after it was decommissioned, it became US 30.  The following year, the section from PA 501 to now US 222 north which currently is the alignment opened to traffic.  In 1954, in Allentown, the designation was extended along Tilghman Street and 7th Street to a interchange with the newly completed Lehigh Valley Thruway/US 22.  Also in 1954, the highway was widened from Gouglersville to Shillington.  In 1958, the designation for northbound US 222 in Lancaster became Conestoga Street and Queen Street.  The same year, construction began on an expressway alignment from Penn Avenue to Warren Street, which opened in 1960.  In 1959, the designation was moved once again in Allentown.  This time it was moved to the then US 309 expressway southwest of town.  Allentown would not be the only city to see changes to the alignment in 1959, as Reading saw the southbound direction changed to Bingaman Street and the northbound direction placed on Laurel Street and 5th Street.

The 1960s continued to see the "merry-go-round effect" of changes to the placement of the designation.  In 1961, northbound US 222 was moved to Queen Street, Church Street, and Lime Street in Lancaster.  In 1963, changes continued in Lancaster with the southbound direction was changed to McGovern Avenue.  In the same year, changes took place in Reading with southbound US 222 moved to Chestnut Street and 4th Street.  Staying in Reading, construction began on an expressway alignment from Penn Avenue to PA 10.  This new alignment opened the following year; however, the US 222 designation continued to be signed through Reading.  In 1965, work continued in northern Reading on the expressway with another section opening in 1966.  Also in 1966, work commenced on another section of expressway from Paper Mill Road to Tuckertown.  More expressway construction began in 1968 with work starting on the section from the US 30 bypass to three miles north of Lancaster.  In 1969, the section from Paper Mill Road to Tuckertown opened to traffic.

The 1970s started with the opening of the expressway from US 30 to three miles north of Lancaster.  The same year construction commenced from that point to the Turnpike, while at the same time, the highway was divided north of PA 272.  More expressway construction began in 1971, when work commenced from Moselem Springs to northeast of Kutztown.  In 1972, the first section of the Lancaster to Reading expressway opened to US 322; however, north of there it was still under construction.  The designation was finally shifted to the new expressway alignment from Lancaster to Brownstown in 1973.  In the same year, the Kutztown bypass opened to traffic, while construction commenced on a section from PA 61 to the present US 222 alignment southwest of Maiden Creek.  Another change in routing took place in 1974, when the US 222 designation was moved to the new expressway from Lancaster to the exit for the PA Turnpike.  In 1975, the section from PA 61 to southwest of Maiden Creek opened to traffic while construction was extended to the Berks County line on the Lancaster-Reading connection.  In 1977, the US 222 designation was moved to follow US 422 to the Warren Street Bypass and then along the current PA 12 expressway to bypass the city.  In 1978, the last section of the Lancaster to Reading expressway opened from the PA Turnpike exit to the Berks County line.  With the new expressway complete, the Pennsylvania Turnpike Commission had to change the layout of the interchange between the Turnpike and US 222.  A new toll barrier and ramps were built.

US 222's new interchange
New interchange layout for US 222.  (Pennsylvania Turnpike Commission)

All was quiet on US 222 through the 1980s, but it became active once again in the 1990s.  In 1996, construction, referred to as the Park Road Project, began on a new segment of expressway from the Warren Street Bypass to the outer expressway bypass of Reading.   This segment opened two years later, and with that the US 222 designation was routed onto it and the outer bypass.

Expressway construction around Reading would not stop there.  After numerous delays in the 1970s and 1980s, Governor Tom Ridge and the General Assembly secured new funding in 1997, which enabled the US 222 project to continue through final design engineering and construction.

End of the Northern Section
How the end of the Northern Section
appeared on state maps from the late 1970s.
(PENNDOT)

In 1998, construction began on the missing segment from the Berks County line to US 422 west of Reading.  The construction was divided into three sections:  Northern - US 422 to PA 724, Central - PA 724 to Old Lancaster Pike, and Southern - Old Lancaster Pike to the Berks County line.  Final paving began on August 16, 2000 on the Northern Section.

Right-of-way being cleared
Right-of-way being cleared in 1999.  (PENNDOT)

On November 9, 2000, the $22.7 million Northern Section opened to traffic and enabled a better connection between Sinking Spring and Shillington.

Opening ceremony for the Northern Section
Federal, state, and local officials at the opening ceremony for the
Northern Section.  (PENNDOT)
 
Construction crew at the opening ceremony
Members of the construction team look on during the
ceremony.  (PENNDOT)

In 2003, PENNDOT completed a needs analysis on US 222 to determine future transportation projects for the unimproved sections of the corridor between Reading and Lehigh County.  From the information that was gathered, engineers will devise a recommendation for improvements.  Project website:  http://www.222connections.com/study/index.html

UNDER CONSTRUCTION

SOUTHERN SECTION
Construction began in early 2003 and is expected to finish in 2006.  The cost of this four mile section is estimated at $47.8 million. 

CENTRAL SECTION
Construction began in August 2001 and is expected to be finished in 2004.  The cost of the project will be $45.7 million.  On July 10, 2001, Dick Corporation of Pittsburgh was awarded the contract, and began almost a month later on August 13 by removing trees and relocating utility lines.  Project website:  http://www.222connections.com/berks/berks.html.

TREXLERTOWN BYPASS
Lehigh County will also see a new segment of US 222, when a boulevard-style alignment is completed around Trexlertown.  The highway will feature four, 12-foot-wide lanes separated by a 30-foot grass median with a westbound off-ramp at Brookside Road, a full interchange at PA 100, and a southbound off/northbound on-ramp at the existing US 222/Hamilton Boulevard near Breinigsville.  New signalized intersections will be built at Cedarbrook Road, Krocks Road, Grange Road, and Grim/Mosser Road.  The first contracts were completed in late 2002 which involved earth moving and placement of more than one million cubic yards of earthen fill at the interchange area near Breinigsville.  The advance contract was necessary to allow the embankments time to settle and compress the clay layers beneath the interchange.  Phase two began in Spring 2003, at a cost of $46.5 million, on the expressway from PA 100 and Hamilton Boulevard, and a new one-mile section of PA 100 from Hamilton Boulevard to the current PA 100 south of Trexlertown.  Scheduled to begin in 2004 is the remaining section of the bypass from PA 100 to Hamilton Boulevard east of Wescosville near Interstate 78.

222 INFORMATION LINE:  1-877-222-1HWY
PROJECT WEBSITE:  http://www.222connections.com/
PROJECT E-MAIL:  [email protected]

Links:
Exit Guide
US 222 Auxiliary Routes
US 222 Pictures
Terminus of US 222 - Dale Sanderson
US 222 Junction List - Tim Reichard
US 222 Pictures - Andy Field/Alex Nitzman


Information INFORMATION
Southern
Entrance:
Maryland state line six miles south of Wakefield.
Northern
Terminus:
I-78 at Exit 54 in Allentown.
Length: 94 miles
National
Highway
System:
Maryland state line to Wakefield
Willow Street to Allentown
Names: Lincoln Highway:  US 30 west to US 30 east
SR
Designations:
SR 0222
SR 0030:  US 30 west to US 30 east in Lancaster
Counties: Lancaster, Berks, and Lehigh
Expressway: US 30 west in Lancaster to Shillington.
US 422 east to Maiden Creek.
Kempville to northeast of Kutztown (Kutztown Bypass)
Multiplexed
Routes:
PA 372:  Quarryville
PA 741:  west of Lampeter to north of Willow Street
PA 272:  Wakefield to Penn Hill
PA 272:  Willow Street to Lancaster
PA 72:  Lancaster
US 30:  US 30 west to US 30 east in Lancaster
PA 724:  Shillington to East Lancaster Avenue
US 422:  US 422 east to US 422 west/PA 12 north
Former
Designations:
PA 3  (1925 - 1930):  Reading to Allentown
PA 13  (1925 - 1930):  Lancaster to Reading
US 230  (1926 - 1929):  Lancaster to the Maryland state line
US 22  (1926 - 1932):  Reading to Allentown
Area Codes: 717:  Maryland state line to the Berks County line
610/484/835:  Berks County line to the Lehigh County line
570:  Lehigh County line to Allentown

Back to Pennsylvania Highways
Back to Pennsylvania United States Highways
Page updated April 06, 2004.
Content and graphics, unless otherwise noted, copyright © Jeffrey J. Kitsko. All rights reserved.
Information sign and US shield courtesy of Richard C. Moeur.
Information courtesy of the Pennsylvania Department of Transportation, Rand McNally, H. M. Gousha, and AAA.