US 220
Appalachian Thruway
Bud Shuster Highway


Well this is it, the ugly stepchild to Interstate 99, or is that the other way around?  The highway that for many years was king through the Appalachian spine has been demoted.  It has been replaced by the designation that is a thorn in many people's sides:  I-99.

The highway followed many different paths on its way through Pennsylvania.  In Altoona, it followed Union, 11th (northbound) and 12th (southbound), Green (northbound), and Chestnut Avenues before heading toward Tyrone.  After Tyrone, it left to head to Bellefonte on current PA 144/PA 150 then north on current PA 64.  Afterwards, it followed PA 150 through Lock Haven to Williamsport.  In Williamsport it followed Fourth Street, Campbell Street, Park Avenue, Hepburn Street, Seventh Avenue, Market Street, Washington Street (now Washington Boulevard) before heading to Towanada and Sayre, and eventually the New York state border.

In 1928, construction began on Pleasant Valley Boulevard in Altoona, and completed the following year.  In 1931, the designation was placed moved onto the highway.  In 1938, the highway was widened from Duncansville to Hollidaysburg.  Widening continued in 1940 with sections from Tipton to Tyrone, west of Montoursville, Athens, and Sayre seeing construction.  In 1941, widening took place near Jersey Shore and east of Montoursville.  In that same year, the designation changed course to head from Halls to Hughesville.  In 1946, the highway was widened from Tipton to Bellewood.  That same year, the designation swapped courses with PA 64 between Milesburg and Mill Hall.  In 1949, the highway was widened from Bellewood to Lakemont, near Avis, and from Williamsport to the section west of Montoursville that had already been completed.

The 1950s saw the widening work continue with sections from west of Williamsport and north of Bedford seeing widening completed in 1951.  In 1956, the highway was widened near the interchange with the Pennsylvania Turnpike in Bedford.  In 1958, widening took place from the section east of Montoursville that was already completed to Halls.  Also in that same year, the highway was divided from Hollidaysburg to Lakemont, near PA 764 to north of Altoona, and Larrys Creek to one mile east of town.  Widening also took place that same year north and south of Towanda.

The 1960s began with work to widen the highway from Larrys Creek to Williamsport finishing.  In 1961, construction began on Valley View Boulevard, which would become the route for northbound US 220 though downtown Altoona.  In 1962 this section opened to traffic.  In 1964, the highway was divided east and west of Montoursville.  Also in that same year, the designation switched routes with PA 36 to follow Plank Road from Hollidaysburg to Altoona.  In 1966, construction began on the segment of Interstate 80 from Exit 158 to Exit 161 that carries the US 220 designation.  In 1967, construction on the first segment of expressway for US 220 began north of Avis to Jersey Shore.  In that same year, work on a new alignment began from Milesburg to north of Howard.  With the plan to route US 220 over Interstate 80 to connect with the end of the future expressway near PA 447, work began on a new approach to the Interstate in 1967 and opened a year later.  This work was also done because of the construction of Foster Joseph Sayers Dam on Bald Eagle Lake.  The former alignment is still used for access to the lake and can be seen at Alex Nitzman's Abandoned U.S. 220 page.  Construction began in 1969 on another segment of expressway for US 220 in the Bedford area.  Work on the Bedford Bypass began south of Bedford Springs north to PA 56.  That same year, the expressway from Avis to Jersey Shore opened to traffic, while work began on the section from there to PA 287.

The 1970s began with the opening of the Bedford Bypass and the section of expressway from Jersey Shore to PA 287.  Also in 1970, a few other expressway projects began:  the Tyrone Bypass from Tipton to PA 350, in Williamsport from US 220 west of town to the US 15 north interchange, and from Greens Landing to Athens.  The following year, work progressed on the Williamsport expressway from Maynard Street to Hepburn Street.  In 1972, the expressway section from Greens Landing to Athens opened to traffic, while work commenced on the extension from there to the New York state line.  Construction continued in Williamsport which now encompassed from US 220 west of town to Maynard Street and from Hepburn Street to the Market Street Bridge.  In 1973, the section of the expressway through Williamsport opened to traffic to South Reach Road.  At the same time, work began on two other sections of expressway:  the Towanada Bypass and around McElhattan.  In 1974, the highway was widened from Sonestown to west of Nordmont.  That same year, two more sections of expressway opened:  the Sayre Bypass and from Maynard Street to Hepburn Street in Williamsport.  While those sections were opening, work on two more were beginning:  East of Lock Haven to Avis and from south to east of Mill Hall.  In 1975, work began on the sections of expressway from PA 56 to the Blair County line, from PA 477 to Avis, and from PA 87 to Pennsdale.  In that same year, the section of expressway from west of Williamsport to Hepburn Street opened.  With this opening, the US 220 designation was changed to Front Street, Mulberry Street, and Washington Boulevard.  In 1976, the Tyrone and Towanda Bypasses opened to traffic, while the designation was switched to Third Street and Fourth Street (southbound) in Williamsport.  In 1977, several more sections opened to traffic from west of Montoursville to Pennsdale and around Avis.  In 1978, the section from Salona to PA 287 opened to traffic.  In that same year, the US 220 designation was moved to Interstate 80 from Exit 158 to Exit 178.

The 1980s began with more sections of expressway opening from PA 56 to the Blair County line and from Front Street to Faxon in 1980.  In 1982, construction began south of Duncansville to Plank Road in Altoona and near Faxon to close the gap in the expressway there.  In 1984, construction was extended to 17th Street in Altoona and the gap in the expressway near Faxon was closed when it opened to traffic in this year.  At that time, the Interstate 180 designation was given to that section from Interstate 80 to US 15 north.  In 1985, the section from south of Duncansville to 17th Street opened to traffic.  In 1987, work began on the section from the Bedford County line to Newry and the following year, the section from East Freedom to Newry opened to traffic.  In 1989, the entire expressway from Bedford to Altoona opened which allowed for a route free of cross traffic, traffic signals, and slow trucks which was a detriment on narrow, mountainous, old US 220.

In 1992, work began to close the gap between the two sections of expressway from 17th Street in Altoona to Graizerville.  In 1995, this section opened to traffic.  In 1996, Representative Bud Shuster who was responsible for funds for the upgrading of US 220, had this highway designated an Interstate and soon I-99 shields began appearing along the highway from Bedford to Tyrone.

Now in the 21st Century, work continues to upgrade US 220 to expressway standards, but under the direction of Interstate 99 construction.  In 1999, work began on a new section of expressway from the Mount Nittany Expressway in State College to the end of the Bellefonte Bypass near Pleasant Gap.  The $194 million project known as the PA 26 Relocation Project, is expected to be completed in late 2002.  Another project which began in the fall of 2000 was construction of I-99 from Scotia Road to the western end of the Mount Nittany Expressway.  Expected completion is in 2003, which at that time, the US 220 designation will be routed onto this expressway and up to I-80 on the above mentioned project.

December 28, 2001 was not a good day to be on the highway, as icy conditions caused a tractor-trailer full of garbage to overturn in Jersey Shore.  The accident cause state police to close down both the north and southbound lanes of US 220 for several hours.  What made things even more difficult was that most of the traffic on the highway was detoured onto it because Interstate 80 was closed due to a massive accident.  The highway reopened on Saturday, December 29.

After four years of construction, the next section of expressway to open was from the Mount Nittany Expressway to the Bellefonte Bypass on November 25, 2002.  Ribbon cutting ceremonies started at 10 AM at the Park Avenue interchange near Beaver Stadium, and the highway opened officially.  The official name of the project was the PA 26 Relocation Project, and cost $195 million to build.  The Bellefonte Bypass section of the expressway was built in 1971 and opened in 1972 as a "Super-2" expressway, a two-lane expressway built on a four-lane right-of-way.  In 1997, the other lanes were built to make it a four-lane highway.  With the opening, the designation was moved to follow US 322 to State College to the new expressway then along PA 26 to I-80.  The former route became Alternate US 220.

As other expressway projects in Pennsylvania, an open house was held on October 26, 2002 called a "Roll & Stroll."  Around 1,000 people are estimated to have walked, biked, skated and strolled along the new expressway.  A four-mile race to benefit the United Way of Centre County was held on the right-of-way, with Penn State's ROTC cadets participating with the public.  This section will not officially become part of I-99 until 2007 when the Bald Eagle to Mount Nittany Expressway sections are completed.

Looking north on the southbound lanes near Harrison Road
Looking north on the southbound lanes
near Harrison Road.  (Michael Brand)

 

Southbound at the PA 144 crossing (4/2000)
Looking southbound across PA 144 near Bellefonte in April 2000.
(Michael Brand)

 

Southbound at PA 144 near Bellefonte (10/2000)
Overpass at PA 144 under construction in October 2000.  (Michael Brand)

 

North from the southbound lanes at the 99/26/64 interchange
Looking north on the southbound lanes at the I-99/US 220/PA 26/PA 64 interchange.
The ramp above leads from I-99/US 220 south to PA 26/PA 64.  (Michael Brand)

UNDER CONSTRUCTION
DICK Corporation

BALD EAGLE TO MOUNT NITTANY EXPRESSWAY

Construction began in fall of 2000 with completion in late 2003.  Project website:
http://i99.dickinfolink.com/.  In February 2004, construction hit a snag when crews unearthed vast quantities of acid rock at Skytop Mountain.  Gary Byron, assistant regional director for the state Department of Environmental Protection said he has never seen a bigger potential for stream damage than the uncovering of this material.  "It's the worst I've seen, and I've been here 27 years," he said.  "The bottom line is, PENNDOT's environmental-impact work for I-99 missed this geologic formation."  Between 500,000 and one million cubic yards of acid rock, previously sealed in geologic formations, is now exposed to rainwater that drains into Buffalo Run which is a tributary of Spring Creek.  Byron went on to say that the rock "is rare, but it is very wicked in chemical composition."  Soda ash briquettes are being used to neutralize the acidic drainage as it washes into the stream.  On March 8, the Department of Environmental Protection shut down construction in a half-mile section until a solution could be reached.

INTERCHANGE WITH I-80
Currently this is a modified diamond interchange.  The new interchange will be a new expressway to expressway, high speed, semi-directional Y.  An additional exit for local highways will be constructed east of Exit 161.  For a detailed plan of the interchange, see http://www.pahighways.com/IHwys/I80-I99interchange.pdf.

NORTH OF I-80
According to Eric High, project engineer for PENNDOT District 3, has said that it is not been decided to extend the I-99 designation north of Interstate 80 as of yet.  His opinion is that the I-99 designation will follow US 220 and US 15 north to I-86 in New York state.  However, there are two short gaps in the expressway between I-80 and Williamsport.  The two gaps are:  I-80 to Salona and Jersey Shore to Williamsport.  PENNDOT will complete these to expressway standards.  Environmental studies and preliminary engineering began by summer 2000 for the Jersey Shore to Williamsport section.  The I-80 to Salona section is not as far in the construction process.  PENNDOT is studying traffic patterns to determine where to connect the expressway to I-80.  However, with the release in 2004 of the revised 12-Year Transportation Program, this project is up in the air due to it being deferred.  Project website:  http://www.susquehannabeltway.com/.

Links:
Exit Guide
US 220 Auxiliary Routes
US 220 Pictures
I-99/US 220 Construction Progress Map
Interstate 99
Interstate 80
Interstate 180
Corridor O - Making Connections
North Altoona Access Study
Road to Ruin - US 220/US 322
Susquehanna Beltway
Vision 2020:  Living with I-99
EcoCheck 99-The Environmental Influence of Pennsylvania Interstate 99 - Juniata College
Interstate 99 - Andy Field/Alex Nitzman
Interstate 99 - Brian Polidoro
Interstate 99 - David Steinberg
I-99/US 220 Construction Pictures - Timothy Reichard
ISTEA / NHS High Priority Corridor 9 - Andy Field
Kurumi's Trippy Drive '71 - Scott Oglesby
Terminus of US 220 - Dale Sanderson
The US 220 Corridor - Timothy Reichard
US 220 Junction List - Timothy Reichard
US 220 Pictures - Doug Kerr


Information INFORMATION
Southern
Entrance:
Maryland state line 11 miles south of Centerville.
Northern
Terminus:
NY 17 in Bradford County.
Length: 231 miles
National
Highway
System:
Maryland state line to Pennsdale.
Names: Appalachian Thruway
Bud Shuster Highway:  Maryland state line to I-80
Z. H. Confair Memorial Highway:  Exit 161 to Exit 179 of I-80
Keystone Shortway:  Exit 161 to Exit 178 of I-80
SR
Designations:
SR 0220
SR 0099:  PA 56 to PA 350
SR 0080:  Exit 158 to Exit 178
SR 0180:  US 15 to Pennsdale
Counties: Bedford, Blair, Centre, Clinton, Lycoming, Sullivan, and Bradford
Expressway: South of Bedford to Bald Eagle.
Business US 322 to I-80.
Cosigned with I-80 from Exit 158 to Exit 178.
PA 477 to PA 287.
West 4th Street in Williamsport to Exit 15 of I-180.
Greens Landing to the New York state line. 
Concurrent
Routes:
I-99:  PA 56 to PA 350
PA 350:  Bald Eagle
US 322:  Port Matilda to State College
PA 26:  Exit 81 to I-80
I-80:  Exit 158 to Exit 178
PA 44:  PA 44 north to Jersey Shore
US 15:  US 15 north to Front Street exit
I-180:  US 15 to Pennsdale
PA 42:  Beech Glen to Muncy Valley
Truck PA 42:  Muncy Valley to Laporte
PA 87:  Dushore
Former
Designations:
PA 64  (1911 - 1926):  Maryland to Tyrone
PA 46  (1911 - 1926):  Tyrone to Graysville
PA 44  (1911 - 1926):  Graysville to Williamsport
PA 4  (1911 - 1926):  Williamsport to Muncy
PA 14  (1911 - 1926):  Muncy to Eagles Mere
PA 42  (1911 - 1926):  Eagles Mere to the New York state line
Area Codes: 814:  Maryland state line to the Clinton County line
570:  Clinton County line to NY 17

Back to Pennsylvania Highways
Back to Pennsylvania United States Highways
Page updated April 06, 2004.
Content and graphics, unless otherwise noted, copyright © Jeffrey J. Kitsko. All rights reserved.
Information sign and US shield courtesy of Richard C. Moeur.
Information courtesy of the Pennsylvania Department of Transportation, Rand McNally, WNEP-TV, and Centre Daily Times.