US 219
North Star Way
Buffalo - Pittsburgh Highway


This highway could be considered historic in a way, because it used to enter the town where 2,200 people died on May 31, 1889 in the greatest disaster in the United States at the time.  The Johnstown Flood of 1889 unleashed 20 million gallons of water onto the unsuspecting city.  The city saw flooding in 1936 and again in 1977, and became known as "Flood City."  The current alignment of US 219 passes less than a mile from the remains of the South Fork Dam, which is the cause of the 1889 catastrophe.

In the early days of this highway, it traversed the center of such towns as Somerset, Johnstown, and Ebensburg.  Between Berlin and Somerset, the highway headed north from Berlin to Brotherton and then was cosigned with PA 31 to Somerset.  In Johnstown in traveled down Franklin, Johns, Union, and Washington Streets and William Penn Avenue to head to Mundys Corner and over to Ebensburg.  Originally, the highway ended at DuBois with US 119 following the remained of the route from there to Wilcox between 1926 and 1927.  In 1927, the designation replaced US 119 and headed north from DuBois and then followed current PA 321 to Kane and was then cosigned with US 6 to Lantz Corner.  In Bradford, the highway followed South Avenue, Main Street, and East Main Street to head to Foster Brook and New York.  In 1938, the designation was changed to Iron Street in Johnstown.

In 1940, work to widen the highway began with sections south of DuBois and Meyersdale undergoing widening.  Also in 1940, the designation changed course to head due north at Ebensburg.  Work would not continue until after World War II, when in 1946, the highway was widened from Cluster City to south of Bradford.  Also this same year, the designation was Conemaugh Avenue to Middle Avenue.  In 1948, the highway was widened near East Conemaugh.  The following year, it was widened north of Somerset to the Turnpike.

The 1950s began with a new alignment under construction north of Burning Well to Lantz Corners.  The following year this alignment opened to traffic; however, without the US 219 designation.  It would not be until 1952 that this section would receive the US 219 markers.  In 1953, the highway was widened south of Bradford, while at the same time, the designation was switched to the current alignment from Berlin to Somerset.  In 1955, the highway was widened from Bradford to Foster Brook.  Widening continued the following year with sections west and north of Ebensburg, north of DuBois, and north of Grampian being completed.  Also in 1956, the designation was changed back to follow Penn Avenue in Johnstown.  Widening also took place in 1958 near Mahaffey.  Construction on a new alignment near Mundys Corner to Ebensburg began in 1959.

The 1960s began with a new alignment opening from Mundy Corners to Ebensburg at the US 422 interchange in 1961.  Also in that same year, the highway was widened south of Ridgway.  Construction began on upgrading US 219 to an expressway from PA 56 east to PA 56 west in 1963.  The following year, the construction was extended from PA 56 west to PA 869.  In 1965, the new highway opened to traffic from PA 56 east to PA 56 west. while at the same time work continued from just north of Summerhill to US 22.  In 1967, the expressway opened from from PA 56 east to US 22.  With this section opening to traffic, the original US 219 alignment received the PA 271 designation.  At the PA 56 east interchange, the US 219 designation left to use Eisenhower Boulevard into Ferndale to continue the path.  Work continued on in 1968, with construction commencing on the section from PA 56 east to the PA 601 connector north of Somerset.  Also, minor work to widen the highway at Interstate 80 took place in that same year.  The following year, the expressway opened from US 30 to PA 403.  At the same time, work began on the Bradford Bypass from Degolia to south of the town.

The first year of the 1970s was celebrated with two new sections of expressway opening from PA 56 east to PA 403 and from US 30 to the PA 601 connector.  Also in this year, construction began on the Somerset Bypass.  In 1971, work on the Bradford Bypass continued with the opening of the section from Degolia to Elm Street, while at the same time construction got underway on the section from Elm Street to Mill Street.  In 1973, two sections of the highway opened:  the Somerset Bypass and the Bradford Bypass to Mill Street.  The following year, construction began on the Ebensburg bypass from US 22 to US 422.  In 1975, construction continued on the Bradford Bypass with the work now moved to the section from Mill Street to the New York state line.  Something strange occurred on the 1976 official state highway map.  In was in this year that the Meyersdale Bypass was shown as being under construction.  In reality, construction did not commence and would not until the 1990s.

Meyersdale Bypass in 1976
Meyersdale Bypass in 1976.
(PENNDOT)

In 1977, the Ebensburg Bypass opened to traffic from US 22 to US 422; however, to continue on US 219, drivers had to still enter Ebensburg and continue north from town.  The US 219 designation would not switch to this route until 1978, and even then drivers had to follow US 422 into town to continue north.  Also in this year, the Bradford Bypass opened to the Foster Brook exit.  In 1979, the entire Bradford Bypass opened to traffic to the New York state line.

The 1990s began with a new section of the US 219 expressway opening.  In 1991, the Ebensburg Bypass opened from US 422 to north of the town.  In January 1997, environmental studies began on the Meyersdale Bypass and entered the construction phase which ended with the opening in January 1999.

Also during the 1990s, is when Representative John Murtha spearheaded a campaign to get money for the upgrading of US 219 to expressway standards through Pennsylvania.  He referred to this highway as Interstate 67, and said that it would provide a much needed highway connection through west-central Pennsylvania and a NAFTA corridor from Buffalo to Miami. 

Promotional Map of the future US 219 corridor
Promotional map depicting
the entire proposed route.
(Rep. John Murtha)

On April 25, 2001, it was announced that PENNDOT will be studying upgrading US 219 between the Meyersdale Bypass and the end of the US 219 expressway in Somerset.  Even though engineering studies were conducted back in the 1970s on this section, environmental requirements and highway design standards have changed since that time and require revisions.  Ron Samuel of PENNDOT District 9 said a minimum of five alternatives will be analyzed for the project:  a relocation of US 219 to the eastern portion of the study area west of Berlin, relocation to the west in the vicinity of the Garrett Shortcut, transportation system management which would include improvements such as intersection realignments, traffic signals, truck climbing lanes, reduction of curves, a no-build alternative, and one additional alternative not yet defined.  Project website:  http://www.us219.com/.

Current end of the expressway near Somerset
The current end of the expressway southeast of Somerset.  The stub
terminates at the border of a state game land.  Those three vehicles in the
median are PENNDOT trucks.

PENNDOT has announced its plans for US 219, which are listed below by county:

County Area of Study Type of Project Cost
Somerset Interstate 68 to Meyersdale • Engineering $3,000,000
Project website:  U.S. 219 - Paving the Way - Interstate 68 to Meyersdale
Somerset to Meyersdale • Engineering $10,190,000
• Right-of-Way $7,000,000
Project website:  U.S. 219 - Paving the Way - Somerset to Meyersdale
Cambria  Carrolltown to Clearfield County • Engineering $3,958,000 
Project website:  U.S. 219 - Northern Cambria County
Elk Johnsonburg Bypass.
Bypass to be a two-lane expressway
or "Super 2."
• Right-of-Way
• Construction
$22,500,000
Project website:  Route 219 Johnsonburg Bypass Project

Funds were secured in the 2000 Fiscal Year for studying the corridor for improvements.  Pennsylvania along with New York received $400,000 to conduct economic impact and traffic analysis studies from Interstate 80 near DuBois to Buffalo.  The Commonwealth also received $500,000 to assist in plans to connect the Turnpike to US 219, to provide a link to Interstate 68 in Maryland.

Jack Murtha HighwayIs this a case of "Bud Envy?"  I noticed this sign on the expressway segment from US 22 to the end north of Ebensburg.  "Jack" refers to Representative John P. Murtha (D) who is the representative for the district that US 219 traverses.  Just as his counterpart Bud Shuster slapped his name on I-99/US 220, I guess John decided that two can play at that game and did the same.  No other section, beside the one mentioned above, have these signs.

Construction for the extension of the Bradford Bypass from near the Kwik-Fill on US 219 to Owens Way began on June 24, 2002.  The new segment of expressway opened to traffic on October 10, 2003 and cost $7,537,000 to build.  The work included a new bridge over Owens Way, and the usual drainage, landscaping, signing, guiderail installation, utility relocation, and wetland mitigation.

Former southern end of the Bradford Bypass
The former southern end of the Bradford Bypass at Owens Way.  It was
like the ends of other expressway segments along the route.  (Doug Kerr)

Trouble might be looming for the plan to upgrade US 219 to an expressway north of Ebensburg.  In 2004, PENNDOT released its revised 12-Year Transportation Program.  This section that is currently being studied has been deferred for the time being.

Links:
Exit Guide
US 219 Auxiliary Routes
US 219 Pictures
Interstate 67
Continental 1 International Trade and Travel Corridor
Continental One World Trade & Travel Corridor
US 219 - Paving the Way
ISTEA / NHS High Priority Corridor 21 - Andy Field
Terminus of US 219 - Dale Sanderson
US 219 Bradford Bypass - Doug Kerr
US 219 Junction List - Timothy Reichard


Information INFORMATION
Northern
Entrance:
New York state line one mile north of Foster Brook.
Southern
Entrance:
Maryland state line six miles south of Salisbury.
Length: 208 miles
National
Highway
System:
Entire length
Names: North Star Way:  Somerset to US 22
Jack P. Murtha Highway:  US 22 to Ebensburg
Buffalo - Pittsburgh Highway:  New York state line to US 119
SR
Designation:
SR 0219
Counties: Somerset, Cambria, Clearfield, Jefferson, Elk, and McKean
Expressway: Meyersdale Bypass
Somerset to Ebensburg
Bradford Bypass
Multiplexed
Routes:
PA 56:  Scalp Avenue exit to the Johnstown Expressway exit
PA 36:  McGees Mills to Mahaffey
US 322:  Luthersburg to US 322 west
PA 948:  Boot Jack to Ridgway
Truck PA 770:  Timbuck to Custer City
PA 770:  Custer City to Degolia
PA 346:  Bradford to Foster Brook
Former
Designations:
PA 6  (1911 - 1926)
US 119  (1926 - 1927):  DuBois to the New York state line
Area Code: 814

Back to Pennsylvania Highways
Back to Pennsylvania United States Highways
Page updated April 05, 2004.
Content and graphics, unless otherwise noted, copyright © Jeffrey J. Kitsko. All rights reserved.
Information sign and US shield courtesy of Richard C. Moeur.
Information courtesy of the Pennsylvania Department of Transportation, Rand McNally, Len Pundt, and Continental 1.