This is one highway that is not as old as its other contemporaries. The designation first appeared in 1935 when it replaced US 122. The route traversed West Chester, Goshenville, Paoli via Swedesford Road to King of Prussia and Norristown. In West Chester, it followed High and Gay Streets, in Norristown it followed DeKalb Street, and in Doylestown it followed State Street.
In 1932, a parkway was proposed roughly along the route of US 202 by the then Regional Planning Federation which is now the Delaware Valley Regional Planning Commission. The plan never got off the ground. In 1938, the highway was widened in Paoli and from Montgomery Square to Montgomery. In 1946, the highway was widened in Bridgeport.
The 1950s were more eventful in the life of US 202. In 1953, the route was split in Norristown with southbound traffic utilizing Johnston Highway, Markley Street, and Lafayette Street. Northbound traffic continued to utilize DeKalb Street. In 1954, construction on the first section of expressway began with work commencing on the West Chester Bypass. In 1955, the bypass opened to traffic and the highway was widened near North Wales and from King of Prussia to Bridgeport. In 1957, widening work continued on the route in West Chester, Doylestown, New Hope, and at the West Chester Bypass and divided near Gwynedd. In 1959, US 202 was made a divided highway from the Delaware state line to the southern end of the West Chester Bypass.
If the 1950s saw more activity on the route than the previous decades, the 1960s would continue the trend. In 1964, the Pennsylvania Department of Highways proposed constructing an expressway paralleling the US 202 corridor from Delaware to New Jersey. The 59 mile-long expressway, which was referred to as the Piedmont Expressway in planning reports, would cost $146 million and serve as an outer beltway for the Philadelphia area. The Department of Highways divided the project into eight sections, and placed seven of them on their six-year improvement program.
Construction began in 1965 from the US 422 expressway interchange to the I-76/Schuylkill Expressway interchange. In 1968, construction began on the section from US 30 to Valley Forge Road. The segment from US 422 to I-76 opened to traffic in 1969, while at the same time construction was extended from the US 30 to the northern end of the West Chester Bypass.
The 1970s began with the opening of the expressway from US 30 to Valley Forge Road and from the northern end of the West Chester Bypass to the PA 100 spur in 1970. However, the US 202 designation was still on its former alignment. In 1971, the expressway opened completely and the US 202 designation was moved onto the new highway. Also opening that same year was the 1,682 foot long New Hope-Lambertville Toll Bridge on July 22, 1971, while construction commenced on the Doylestown Bypass. The following year, construction was extended to the existing US 202 alignment east of Doylestown and the segment from King of Prussia to Crooked Lane was divided. The first segment of the Doylestown Bypass opened to traffic in 1973 from PA 611 to the existing US 202 alignment east of town. Construction of the Doylestown Bypass from the US 202 alignment west of town to PA 611 began in 1975, while US 202 was moved to a new alignment to cross the New Hope-Lambertville Toll Bridge to bypass New Hope. This was to be a temporary highway as it was to be replaced with the Piedmont Expressway. Also in that year, construction began on a new southbound US 202 alignment from Norristown to Beidler Road. In 1976, two new segments of US 202 opened to traffic: Doylestown Bypass from US 202 west of town to PA 611, but the designation would not move for another year. The other new segment to open was the new southbound highway in Montgomery County from Beidler Road to Norristown. In 1977, PENNDOT withdrew funding for the expressway segment through Bucks County due to opposition from residents who saw it as a truck bypass and would destroy the rural quality in the county. Another section to get the fiscal axe was the planned segment from Upper Merion Township to Montgomery Township in Montgomery County.
Another segment that would not see the light of day was from Valley Forge to Lower Gwynedd Township. The expressway would have taken one of two paths: the existing alignment would be upgraded to an expressway or another route paralleling PA 363 that would bypass Norristown utilizing the US 422 expressway and rejoin the US 202 near the Pennsylvania Turnpike-Northeast Extension.
The planned expressway alignment from the Delaware state line to the southern end of the West Chester Bypass seems to be the forgotten one. It would have parallel the existing US 202 alignment to the west. An interchange with the unbuilt US 1 expressway would have been constructed in the vicinity of the Brandywine Battlefield State Park. This expressway would have continued into Wilmington to provide access to I-95 and another unbuilt highway the DE 141 Expressway. However, no right-of-way was purchased for this section.
In 1978, ramps were constructed on the new southbound highway at PA 23 for the proposed Schuylkill Parkway, but were revamped in 1986 after the project was scrapped.
In 1983, the Delaware Valley Regional Planning Commission recommended building the US 202 expressway from Doylestown south to a proposed extension of the Fort Washington Expressway near Lansdale. In 1989, another study by the commission concluded that the expressway could use existing land set aside for the construction, thus preventing personal properties being acquired for the project. PENNDOT began engineering and environmental studies along this section in 1990. The original route was to be 10.5 miles, but was shortened to 8.9 miles in the mid-1990s. Approval for this new highway came from the Federal Highway Administration on August 27, 1998.
The 1990s saw improvements take place along the route. In the late 1990s, PENNDOT spent $3.6 million to rebuild 2.6 miles of the route from King of Prussia to Bridgeport. On March 16, 1999, PENNDOT began work on rebuilding the section of US 202 from Tredyffrin Township, Chester County to Upper Merion Township, Montgomery County. The process began in 1986 with environmental impact studies along the route, with preliminary designs in the early 1990s, and concluded with PENNDOT receiving final engineering and environmental design approval from the Federal Highway Administration in 1996.
The project consists of widening the existing expressway to six lanes from North Valley Road to Gulph Road. New bridges were built at Old Eagle School Road and South Warner Road. New sound barriers and drainage improvements were also a part of the work.
![]() Grading for the new highway (PENNDOT) |
![]() Pouring the concrete (PENNDOT) |
![]() Placing the finishing touches (PENNDOT) |
![]() The new highway open to traffic. (PENNDOT) |
The interchange between US 202, US 422, and I-76 is being rebuilt so weaving is decreased. A new ramp from US 202 northbound to I-76 eastbound and a new collector-distributor highway will provide access from US 202 southbound to US 422 and I-76. The new ramp opened to traffic on December 13, 2001, at that time the former ramp from US 202 north to I-76 east closed.
![]() Collector-distributor ramp system under construction at the US 422 interchange. (PENNDOT) |
![]() Workers standing on bridge beams over new ramp. (PENNDOT) |
![]() Construction of the new ramp from US 202 north to I-76 east. (PENNDOT) |
In early 2001, sinkholes proved to be a problem within the interchange. They had been anticipated, which PENNDOT planned $30,000 for sinkhole mitigation due to disturbing the top soil. Some of them were 150 feet deep and forced emergency work to be performed to stabilize them by pumping grout into the voids, as was done at the Mid-County Interchange project on the Turnpike which is located nearby. So much grout was needed that a production facility was built at the site. The cost of the work was $17 million and could reach to nearly ten times the original projected price when work ends.
![]() Sinkhole at the US 422 interchange. (PENNDOT) |
![]() Another sinkhole at the US 422 interchange. (PENNDOT) |
Part of the interchange will open in early 2002, with the entire rebuilt interchange opening in 2003. Other interchanges to be rebuilt were the Chesterbrook Boulevard interchange in Paoli. PENNDOT extended Chesterbrook Boulevard south to PA 252. Swedesford Road interchange and the Valley Forge Road interchange saw minor improvements.

Green indicates lanes and ramps to
be reconstructed
or reconfigured; red indicates new lanes and ramps to be
constructed on new alignment. (PENNDOT)
One of the more challenging aspects of the project was the moving of the historic King of Prussia Inn, which used to sit in the median of US 202 just north of the I-76 interchange. In August 2000, the inn was moved from the old location to Bill Smith Boulevard in Upper Merion.
![]() |
![]() |
| Two views of the historic King of Prussia Inn's move in August 2000. (PENNDOT) | |
The $290 million project concluded at 10:30 AM on October 30, 2003, when Pennsylvania Transportation Secretary Allen Biehler cut the ribbon signaling the rehabilitated expressway was finished.
As a new century dawns on the highway, numerous improvements are planned. PENNDOT plans to widen the four-lane expressway to six lanes from West Center to Tredyffrin Township. The project will entail building new collector-distributor ramps for the PA 29 interchange, new ramps for the PA 401 interchange, and construction of new bridges. Planning for the $130 million project is expected to continue through 2003 with work to begin in 2004 and finish in 2008.
The Montgomery Township, Montgomery County to Doylestown Township, Bucks County section of the US 202 expressway that was discussed in the late-1980s and early-1990s and approved in 1998 was slated to begin in 2003. The $280 million "new alignment alternative" will consist of four 12 foot-wide lanes and grades kept at a maximum of four percent with a design speed of 65 miles per hour. Interchanges are planned to be built at PA 63, PA 309, County Line Road, Bristol Road, and PA 611. The project is slated to be completed in late 2006. With PENNDOT restructuring their 12-Year Transportation Program, this project is now being reevaluated. Project website: http://www.us202.com/Pages/700/section700_home.htm
Bucks County US 202 Emergency Detours |
Chester County US 202 Emergency Detours |
Links:
Exit Guide
US 202 Pictures
US 122
E-ZPass - Delaware River Join Toll Bridge Commission
New Hope-Lambertville Toll Bridge
- Delaware River Joint Toll Bridge Commission
US 202 Information Center
Eastern Megalopolis
Bypass - Ben Holmberg
Road to Ruin - US 202
Terminus
of US 202 - Dale Sanderson
US
202 - Steve Alpert
US 202 Expressway -
Steve Anderson
US 202
Junction List - Tim Reichard
US 202
Pictures - Andy Field/Alex Nitzman
INFORMATION |
|
| Southern Entrance: |
Delaware state line near Elam. |
| Northern Entrance: |
New Jersey state line at the New Hope-Lambertville Toll Bridge in New Hope. |
| Length: | 61 miles |
| National Highway System: |
Entire length |
| Names: | None |
| SR Designation: |
SR 0202 |
| Counties: | Delaware, Montgomery, and Bucks |
| Expressway: | South of West Chester to I-76 West of Doylestown to PA 313 (Doylestown Bypass) |
| Multiplexed Routes: |
US 322: US 1 to West
Chester Bypass PA 309: PA 463 to Montgomeryville PA 463: PA 309 to Montgomeryville PA 152: Chalfont PA 611: Easton Exit to Edison Exit (Doylestown Bypass) PA 263: Buckingham to Lahaska |
| Former Designations: |
US 122: 1926 - 1935 |
Traffic Conditions: |
Wilmington,
DE - US 30/Frazer US 30/Frazer - Norristown/Main Street #211/215-567-5678 |
| Area Codes: | 610/484/835 |