US 15
Marine Corps League Memorial Highway


This US highway did not reach Pennsylvania until the latter 1920s.  In 1927, the route was extended from Virginia to end in Lemoyne.  In historic Gettysburg, it was signed on Emmitsburg Road, Baltimore Street, Carlisle Street, Lincoln Avenue, and Harrisburg Road.  Traversed Camp Hill on Simpson Ferry Road and 18th Street before ending in Lemoyne on State Street.

The 1930s saw most of the activity along the highway take place at the latter end of the decade.  In 1937, the designation was extended up along the eastern shore of the Susquehanna River along the current PA 147 alignment to Northumberland, Milton, Muncy, Montoursville, and to Williamsport before turning to head to New York state on the current alignment.  In Harrisburg, it was placed on Front Street, and in Williamsport on Washington Boulevard, Market Street, Hepburn Street, and High Street.  In 1939, the designation was moved to Harris Place in Williamsport.

The 1940s saw widening take place from south of in Gettysburg, Speeceville to the town, in Sunbury, Northumberland to north of town, and north of Montoursville in 1940.  In 1941, the designation was moved to the current alignment on the western shore of the Susquehanna River which displaced PA 404 from Shamokin Dam to Williamsport.  With that change, came changes to the route in various towns such as in Lemoyne on Front Street, 8th Avenue in South Williamsport and Market Street in Williamsport.  Widening also took place on a section south of South Williamsport that year.  In 1945, the highway was widened from Selinsgrove to Shamokin Dam, while the designation moving kept going in Williamsport.  Northbound traffic would be moved to Market Street to Hepburn Street while southbound traffic would use Hepburn Street, and 7th Street.  The moving continued into 1948, with southbound traffic moved to Pine Street and 6th Street.  In 1949, the highway was widened from US 522 to Shamokin Dam and at the Snyder/Union County line.

The 1950s began with widening taking place from the Clarks Ferry Bridge to Amity Hall.  Also construction began on the new Market Street Bridge in Williamsport.  The following year, widening took place on the alignment from south of Selinsgrove to town, and from south of Williamsport to town.  Not to be outdone, Williamsport saw a lot of activity itself in 1951.  The new Market Street Bridge opened to traffic in July of that year, and with that came changes in the route in the city.  The designation was moved to Hastings Street for northbound traffic and Market Street for southbound traffic in South Williamsport.  In 1952, widening took place from Amity Hall to south of Selinsgrove and PA 54 to south of South Williamsport.  The following year the highway was widened in Dillsburg, and from Allenwood to PA 54.  Construction began on a new alignment around Powys in 1954 which opened to traffic the following year as did the widening that took place north of the town.  Also in 1955, the section from the Turnpike to US 11 in Camp Hill was widened while construction commenced on its replacement from the Turnpike to 32nd Street.  In 1956, widening took place on the alignment southeast of Arnot and extended farther south of that location the following year.  The first section of the expressway opened from the Turnpike to 32nd Street, with the street carrying the US 15 designation to US 11.  The year 1958 saw varying construction activities take place along the highway.  US 15 was divided in York Springs, Carlisle to the approach to the M. Taylor Bridge, in Kenkora Heights, from the Clarks Ferry Bridge to Amity Hall, in Lewisburg, White Deer to Allenwood, and south of Williamsport.  Widening took place that year north from Williamsport.  In 1959, the new alignment opened form Dillsburg to the Turnpike while the highway was divided south of Montgomerys Ferry.

The 1960s continued to see work to widen and divide the alignment to create a safer US 15.  In 1960, the highway was divided from Kenkora Heights to Amity Hall.  Construction began in 1962 on a new expressway alignment to bypass the historic town of Gettysburg from the Maryland state line to PA 234, and from York Springs to Dillsburg.  The section from Maryland to PA 394 opened to traffic in 1963.  The highway was divided that year from Shamokin Dam to Lewisburg.  In 1964, the route was upgraded to expressway standards from Kenkora Heights to Amity Hall.  Construction began on another section of expressway from south of West Milton to White Deer.  Also, dividing occurred on a section from Williamsport to Race Street outside the city limits, with an interchange built at Race Street.  The first section of the West Milton to White Deer expressway section opened from New Columbia to White Deer in 1965.  In Williamsport, the designation for both directions was moved to Pine Street and Park Avenue the same year.  Construction started once again north of Gettysburg from PA 394 to north of Heidlersburg in 1966.  With construction starting there, it was wrapping up on the section from south of West Milton to New Columbia which opened to traffic.  That was not the only work to be performed in 1966, as the highway was divided from south of Steam Valley to south of Buttonwood.  In 1968, the expressway opened from PA 394 to York Springs.  What was different about this section is that it was built with four lanes instead of two as the other section from Maryland to PA 394 had been built.  The same year, the highway was divided from Williamsport to Hepburnville.  In 1969, construction began on the section of expressway from PA 14 to two miles north.

The 1970s began with work concluding on that section of expressway.  The following year, work to divide the highway at the Interstate 81 interchange began and finished in 1973.  The year 1971 also saw construction begin on the section of what would becoming I-180 from Exit 27 to Exit 29.  Construction got underway on another section of expressway in 1973, from Steam Valley to north of Liberty.  In 1972, as work was still progressing on the section in Williamsport, construction began on a connection from I-180 to High Street.  In 1974, the expressway in Williamsport opened from now Exit 27 to Exit 28, and the with it came a change in the course of US 15 in the city.  The new route followed Front Street to the expressway section, then Maynard Street,  3rd Street (northbound), Campbell Street (northbound), and High Street (northbound), Cemetery Street (southbound), and West 4th Street (southbound).  That same year, construction began on the Selinsgrove Bypass and on the section from Lambs Creek to north of Tioga.  In 1975, the expressway route from Maynard Street to High Street opened and with it, the US 15 designation was moved out of Williamsport onto the new highway.  The expressway section from Steam Valley to Sebring opened in the year of the United States' Bicentennial as a "Super 2" two-lane expressway.  In the latter years of the 1970s, the Selinsgrove Bypass opened in 1977, and the interchange at PA 114 and the section of two-lane expressway from Lambs Creek to north of Tioga opened in 1978.

In 1985, construction began on the Mansfield Bypass and opened to traffic in 1987 as a "Super 2" expressway.  As traffic increased around Gettysburg, PennDOT saw that a widening of the existing bypass was in order.  In 1988, construction began to widen the Gettysburg Bypass by building another set of lanes on the other side of a median.  In 1989, the work was complete and with that, traffic could flow freely on four lanes from Harrisburg to Maryland.  Also that same year, construction began on the section of expressway north of Williamsport from High Street to Hepburnville.

The 1990s began with that section of expressway opening to traffic in 1990.  Construction continued on upgrading US 15 north of Williamsport to expressway standards with work beginning on the section from Hepburnville to Powys.  In October 1994, this section of expressway opened to traffic while work on the next section from Powys to Trout Run began.  In October 1996, that section of expressway opened while work began on the section around Sebring.  In 1997, the expressway opened from Sebring to Bloss Mountain in September 1997.  Expressway construction was not the only work occurring, but also upgrading of existing expressway sections took place.  The existing expressway that was built as a "Super 2" was upgraded to four lanes in November 1998.  In June 1998, the widening and dividing of the highway from Trout Run to Buttonwood was completed.  Also, the extension of the expressway around Sebring was completed and opened.  In June 1999, construction began on widening the Mansfield Bypass to four lanes.  Project website:  http://www.route15-mansfield.com/.

I 99The first year of the 21st Century began with construction beginning on extending the expressway from north of Sebring to Blossburg which was completed in November 2000.  Work along this section is now speeding along in preparation of the alignment from Williamsport to the New York state line to be incorporated into the Interstate 99 right-of-way.

Future I 99 Corridor
Future I-99 Corridor sign southbound near Trout Run.  (Timothy Reichard)

The construction of the expressway alignment from Blossburg to the southern end of the Mansfield Bypass in 2001, and is projected to be complete in late 2003.  Also in February 2001, construction began on the new lanes on the Mansfield Bypass which is projected to be complete in late 2002.  Construction began on a welcome center on the Mansfield Bypass, overlooking the Tioga Reservoir in November 2001 and is projected to finish in late 2002.  Not expressway construction, but reconstruction/widening took place on US 15 from Montgomerys Ferry to McKees Falls and finished in late 2001.  The project resulted in an at-grade highway with four lanes for the entire section.  The southern half is divided by a Jersey barrier, while the northern half has a center turning lane.  Jug-handled intersections can be found all along it, and the traffic signals are linked and coordinated.  Reconstruction of the substandard southbound lanes of Trout Run to Buttonwood section of the expressway is slated to begin in early 2004 and finish in late 2006.

Problems are arising on the Mansfield Bypass to Presho, NY section of the proposed expressway.  PennDOT is leading the design in both Pennsylvania and New York, and construction of the Pennsylvania section and a temporary section in New York.  Work is projected to begin in 2002 with completion projected for 2004.  The problem is that funding and schedule for the remainder of the New York portion to Interstate 86 is uncertain.

Construction on another section of US 15 expressway is planned to begin in 2004.  It will begin at the northern "stub-end" of the Selinsgrove Bypass, cross the Susquehanna River just north of Shamokin Dam and connect to PA 147.  PA 147 will be widened to four lanes; however, US 15 will remain on the west side of the river on the current alignment.  Project website:  http://www.csvt.com/.

Northbound in Duncannon
Northbound in Duncannon.
 
Northbound at the US 22/US 322 interchange in Amity Hall
Northbound at the US 22/US 322 interchange in Amity Hall.
 
Northbound on the west side of Williamsport
Northbound on the west side of Williamsport.
 
Northbound nearing Hepburnville
Northbound nearing Hepburnville.
 
Northbound in Hepburnville
Northbound in Hepburnville.
 
Northbound near Perryville
Northbound near Perryville.
 
Northbound near Trout Run
Northbound near Trout Run.
 
Northbound north of Trout Run
Northbound north of Trout Run.
 
Northbound at the PA 284 Exit
Northbound at the PA 284 Exit.
 
Northbound near Liberty
Northbound near Liberty.
 
Northbound near Blossburg
Northbound near Blossburg.
 
Northbound north of Blossburg
Northbound north of Blossburg, at the end of the current expressway.
 
Northbound on the Mansfield Bypass
Northbound on the Mansfield Bypass, which is being widened to four lanes.
The future northbound lanes will be where the dirt is on the right side of the
picture to the truck and the concrete overpass.
 

Northbound at the Tioga Reservoir.  The future southbound lanes are
being built right now on the other side of the Jersey barrier.
 
Southbound at the PA 287 Interchange north of Tioga
Southbound at the PA 287 Interchange north of Tioga.  (Doug Kerr)
 
Southbound at the northern end of Business US 15 in Mansfield
Southbound at the northern end of Business US 15 in Mansfield.
 
Southbound at US 6 Interchange west of Mansfield
Southbound at US 6 Interchange west of Mansfield.  (Doug Kerr)
 
Southbound near Sebring
Southbound near Sebring.
 
Southbound near the PA 414 Exit
Southbound near the PA 414 Exit.
 
Southbound near Buttonwood
Southbound near Buttonwood.
 
Southbound near Trout Run
Southbound near Trout Run.
 
Southbound nearing Hepburnville
Southbound nearing Hepburnville.
 
Southbound nearing Williamsport
Southbound nearing Williamsport.

Links:
Exit Guide
US 15 Auxiliary Routes
Interstate 99
Interstate 180
US 240
Central Susquehanna Valley Transportation Project
The Route 15 Coalition
US 15 Mansfield Bypass (Tioga County)
US 15/PA 581 Improvement Project (Cumberland County)
New US 15-Tioga Southbound to Mansfield - David Slauenwhite
Terminus of US 15 - Dale Sanderson
The US 15 Corridor - Timothy Reichard
US 15/I-99 Update - Mark Sinsabaugh
US 11/US 15 Selinsgrove Bypass - Alex Nitzman
US 15 Expressway Scenes - Alex Nitzman
US 15 Junction List - Timothy Reichard
US 15 Pictures - Doug Kerr


Information INFORMATION
Southern
Entrance:
Maryland state line two miles south of Fairplay.
Northern
Entrance:
New York state line near Lawrenceville.
Length: 189 miles
National
Highway
System:
Entire length
Names: Marine Corps League Memorial Highway
Blue and Grey Highway:  Maryland state line to PA 234
Susquehanna Trail:  Harrisburg to the New York state line
SR
Designations:
SR 0015
SR 0180:  Exit 27 to Exit 29 in Williamsport
Counties: Adams, Cumberland, Perry, Juniata, Snyder, Union, Lycoming, and Tioga 
Expressway: Gettysburg Bypass
PA 114 to US 11
PA 274 to US 22/US 322
Selinsgrove Bypass
Milton to White Deer
Concurrent with I-180/US 220 from Exit 27 to Exit 29.
I-180/US 220 to three miles north of Trout Run.
Buttonwood to north of Sebring.
Two miles north of Covington to PA 287.
Concurrent
Routes:
PA 74:  Dillsburg
US 11:  PA 581 to Shamokin Dam
I-180:  Exit 27 to Exit 29 in Williamsport
US 220:  Exit 27 to Exit 29 in Williamsport
Former
Designations:
PA 24  (1911 - 1926):  Maryland state line to Lemoyne
US 240  (1926 - 1927):  Maryland state line to Lemoyne
US 220  (1926 - 1927):  Williamsport to the New York state line
US 111  (1927 - 1937):  Shamokin Dam to the New York state line
PA 4  (1911 - 1926):  Harrisburg to Shamokin Dam and Williamsport to the New York state line.
PA 404  (1911 - 1941):  Shamokin Dam to Williamsport
PA 5  (1926 - 1935):  Lemoyne to Amity Hall
PA 14  (1935 - 1941):  Lemoyne to Amity Hall
Area Codes: 717:  Maryland state line to the Snyder County line.
570:  Juniata County line to the New York state line.

Back to Pennsylvania Highways
Back to Pennsylvania United States Highways
Page updated July 10, 2003.
Information sign and US shield courtesy of Richard C. Moeur.
Information courtesy of the Pennsylvania Department of Transportation, Rand McNally, AAA, General Drafting, and Len Pundt.