
John H. Ware III Memorial Highway
Roosevelt Expressway
Roosevelt Boulevard
Martin Luther King Jr. Expressway
This is the original north-south artery in the United States. It predates Interstate 95 by at least 50 years. US 1 was signed in 1926 when the United States initiated the original Interstate System that gave us the US routes.
The highway in northern Philadelphia got it start in 1902, when then Philadelphia Mayor Samuel H. Ashbridge, proposed the Torresdale Boulevard. The boulevard would have a 300-foot right-of-way from Broad Street northeast to the town of Torresdale. At that time, this area was mostly farming communities connected by dirt trails. With this new highway, that area would have a direct connection with central Philadelphia. The sections of the Torresdale Boulevard opened in 1903, 1907, 1911, and 1914. The cost of construction was estimated at $3.5 million dollars, and upon completion it was renamed the Northeast Boulevard. It was renamed after Theodore Roosevelt after it was extended to Pennypack Creek in 1918.
From the Maryland border, US 1 traveled through Oxford, West Grove, Kennett Square and split from the current alignment to go into Philadelphia on Baltimore Pike and then Baltimore Avenue. After going through the "City of Brotherly Love" on 44th Street, Powelton Avenue, 31st Street (northbound), 32nd Street (southbound), Spring Garden Street, Broad Street, and Roosevelt Boulevard; US 1 became the Lincoln Highway and traveled through Oakford, Oxford Valley, and Morrisville before entering the "Garden State."
By 1940, US 1 had been widened from Oxford to Avondale, Hamorton to the Philadelphia City line, and the Philadelphia City line to the New Jersey state line. In the late-1940s, construction began on the 1,324 foot long Trenton-Morrisville Toll Bridge which opened to traffic in 1952. In 1954, the routing through Philadelphia was changed from Broad Street to Zoological Avenue, Girard Avenue, 33rd Street and Hunting Park Avenue. In 1957, the Schuylkill Expressway opened that would become a section of today's US 1. In 1958, construction began on the Roosevelt Expressway from now I-76 to PA 611. In the final year of the 1950s, construction began on the Media bypass from PA 352 to PA 320.
During the late 1950s, when the Interstate System was beginning to take shape, Pennsylvania had originally planned to route I-95 along US 1 in Bucks County. The Federal Bureau of Public Roads was concerned that this would serve the same purpose as the New Jersey Turnpike. Interstate 95 was to leave the Delaware Expressway alignment and connect to US 1 at Langhorne to continue northward across the Trenton Toll Bridge into New Jersey. The Garden State did not like routing the Interstate across the bridge, so Pennsylvania and New Jersey jointly proposed three crossing: Scudders Falls, Trenton Toll Bridge, and Biles Island. The two states agreed on the Scudders Fall crossing in 1960, and in 1964 the Bureau of Public Roads approved the current alignment for I-95 in Bucks County.
The 1960s began with the opening of the Media bypass and the rerouting of US 1 onto it to City Line Avenue to the Schuylkill Expressway. In 1961, the highway was divided from Concord to Avondale and in 1963 from Avondale to the Philadelphia City line. Another event occurred in 1961, which was the opening of the $3.6 million Roosevelt Expressway opened to traffic. In 1964, the expressway sections from US 13 to the New Jersey state line. In the southern part of Pennsylvania, the US 1 expressway opened from PA 41 to the current US 1 near Kennett Square. In 1965, the Trenton-Morrisville Toll Bridge was widened from four lanes to six lanes.
In 1966, with congestion building on the Roosevelt Boulevard as Northeast Philadelphia began to grow, the city planning commission proposed a Northeastern Expressway. The new highway would be constructed from Hunting Park Avenue to the Pennsylvania Turnpike near Bensalem. The expressway would have followed the existing boulevard for the most part, with the exception of veering north and west above Tacony Creek Park onto a new alignment. This new alignment would have run along Pennway Street and Northeast Avenue and then tying into the now Martin Luther King Jr. Expressway. Although never officially dropped by PENNDOT, the expressway plan hasn't been discussed in any plans since 1980.
In 1968, construction began on the expressway from PA 41 to PA 896, and from the now Bristol Road exit to I-95. In 1969, construction was extended from the PA 896 interchange to the current end of the expressway portion near the Maryland state line.
The 1970s began with the complete opening the the US 1 expressway from near the Maryland state line to near Kennett Square. Also in 1970, the expressway section from the Philadelphia city line to I-95 opened while construction started on the section from Interstate 95 to the Oxford Valley exit. In 1972, that section opened to traffic even though the US 1 designation continued to be on what is now Business US 1. In 1978, the expressway opened from Fallingston to US 13.
In 1983, an aluminum median barrier was erected across the Trenton-Morrisville Toll Bridge, which created three northbound and two southbound lanes. In 1984, construction began on the last link of the northern US 1 expressway which finally opened in 1987, thus completing US 1 in Pennsylvania as it is seen today.
In 1993, Interstate 476 finally opened and brought a different type of interchange to the US 1 exit. It is referred to as a 3-level diamond or "Volleyball Interchange" by Scott Oglesby. He can explain it better than I can, so visit Kurumi's Field Guide to Interchanges. This is the only one like it in the Commonwealth of Pennsylvania.
Every year, State Farm Insurance comes out with their top ten most dangerous intersections. For 2001, two intersections on Roosevelt Boulevard have been voted number 2 and number 3 worst. They are located at Red Lion Road and Grant Avenue respectively. The ranking was determined by the number of crashes at the intersection, how many of those crashes involved injury, and the severity of those crashes.
![]() Roosevelt Boulevard at Red Lion Road: Number 2. (State Farm Insurance) |
![]() Roosevelt Boulevard at Grant Avenue: Number 3. (State Farm Insurance) |
Conditions have gotten so bad on Roosevelt Boulevard, that the City of Philadelphia and PENNDOT formed a joint task force in 2002 to come up with some short term solutions. One of them was the installation of new signage. Most of the medium and long term improvements involve reconstruction of the highway. Some of it is quite extensive and expensive, and there is no money right now for such projects.
Even though Roosevelt Boulevard isn't going to see any improvement in the near future, other parts of US 1 were getting a facelift. Beginning in September 1997, four improvement projects totaling $15 million took place in Delaware and Chester Counties. That project cost $4.7 million and took place on four miles of highway between PA 52 and the Delaware/Chester County line. In April 1998, a $1.1 million project to add a left turn lane on the northbound side of US 1 at Darlington Road concluded. In April 2000, PENNDOT completed a $4.3 million improvement of the highway between PA 352 and Thornton Road in Chester Heights, which consisted of median barrier installation, left turn lanes, and a jug handle intersection at Cheyney Road. The last project began on September 5, 2001 between the Delaware/Chester County line and Thornton Road, and consisted of installing median barriers and left turn lanes at certain intersections. The $4,733,376 project ended in May 2002.
Bucks County US 1 Emergency Detours |
Chester County US 1 Emergency Detours |
Links:
Exit Guide
US 1 Auxiliary Routes
US 1 Pictures
E-ZPass - Delaware River Joint Toll Bridge Commission
Trenton-Morrisville Toll Bridge - Delaware River Joint Toll Bridge Commission
Lansdowne Expressway -
Steve Anderson
Roosevelt
Boulevard - LaSalle College High School
Roosevelt Expressway
- Steve Anderson
Terminus
of US 1 - Dale Sanderson
Trenton Toll Bridge - Steve Anderson
US 1 Chester
County Expressway - Alex Nitzman
US 1 Expressway (Bucks County Section) - Steve Anderson
US 1 Expressway (Chester County Section) - Steve Anderson
US 1 Junction List - Tim Reichard
US
1 Pictures - Andy Field/Alex Nitzman
West Philadelphia
(52nd Street) Expressway - Steve Anderson
INFORMATION |
|
| Southern Entrance: |
Maryland state line one mile south of Nottingham. |
| Northern Entrance: |
New Jersey state line at the Trenton Toll Bridge in Morrisville. |
| Length: | 81 miles |
| National Highway System: |
Entire length |
| Names: | John H. Ware III Memorial Highway:
Maryland state line to Kennett Square Roosevelt Expressway: I-76 to PA 611 Roosevelt Boulevard: PA 611 to PA 132 Martin Luther King Jr. Expressway: PA 132 to the New Jersey state line |
| SR Designations: |
SR 0001 SR 0076: Exit 339 to Exit 340B |
| Counties: | Chester, Delaware, Philadelphia, and Bucks |
| Expressway: | Maryland state line to Longwood
Gardens Black Horse to Marple Multiplexed with I-76 from Exit 339 to Exit 340B I-76 to PA 611 in Hunting Park Bensalem to the New Jersey state line |
| Multiplexed Routes: |
PA 52: Longwood Gardens
to Hamorton PA 100: Chadds Ford US 322: US 202 to Concordville I-76: Exit 339 to Exit 340B US 13: PA 611 to Levick Street PA 63: Red Lion Road to Veteran's Memorial Road/Woodhaven Road |
| Former Designations: |
PA 12 (1925 - 1930):
Maryland state line to Philadelphia PA 1 (1925 - 1930): Philadelphia to the New Jersey state line |
Traffic Conditions: |
US
202 - I-76 I-76 - I-95/I-295 #211/215-567-5678 |
| Area Codes: | 610/484/835: Maryland state
line to the Philadelphia county line 215/267/445: Philadelphia county line to the New Jersey state line |