The longest north-south Interstate in Pennsylvania, which was also planned to be a toll highway, has its beginnings back in the 1950s.  In fact, the part from Scranton to the New York line was to be a continuation of the Northeast Extension, but no final designs were completed by the Turnpike Commission.  Another extension that would have followed the current I-81 alignment, referred to as the Scranton Extension, and connected to the mainline Turnpike anywhere from east of Harrisburg to the Delaware River Bridge.  This was also planned before the Interstate legislation that was passed on June 30, 1956.

With the act passed, work on this highway was transferred over to the Department of Highways. In 1958, construction began on the part from Exit 188 to Exit 191.  In 1959, construction began on the section from the Maryland state line to Exit 3.  Another section was under construction at the same time from Exit 194 to the New York state line.

In 1960, the section from Exit 188 to Exit 191 was completed.  In 1961, more of Interstate 81 opened from Maryland to Exit 3 and from Exit 194 to Exit 202.  Work began on more sections from Exit 3 to Exit 48 and Exit 187 to Exit 188. In 1962, construction got under way on the sections form Exit 44 to Exit 52 and Exit 186 to Exit 187.  While at the same time, Interstate 81 opened to traffic from Exit 187 to Exit 188 and Exit 202 to the New York state line.  In 1963, the sections from Exit 3 to Exit 5, Exit 48 to Exit 52, and Exit 186 to Exit 187 opened to traffic while construction began on the Exit 170 to Exit 175 section.  In 1964, the sections from Exit 29 to Exit 44, Exit 170 to Exit 175, and the interchange with I-84/I-380 to Exit 191 opened to traffic while construction began from Exit 175 to Exit 178 and Exit 180 to Exit 188.

In 1965, construction commenced on the section from Exit 178 to Exit 180, which included upgrading the then PA 315 alignment.  Construction began on the section from Exit 138 to the interchange with I-80 in that same year.  In 1966, construction was extended from Interstate 80 to Exit 143 and from outside Ginther to outside Gordon.  That year, the Interstate opened from Exit 175 to Exit 187.  In 1968, the section from Exit 143 to Exit 165 opened to traffic, while at the same time work began on the section from Exit 69 to Exit 143.  In 1969, the section from Exit 116 to Exit 143 opened to traffic, while work began on the George N. Wade Bridge over the Susquehanna River north of Harrisburg.

Construction going on south of Hazleton in 1968
Construction going on south
of Hazleton in 1968.
(James P. Blair/National Geographic)

In 1970, work began on the section from Exit 52 to Exit 57, while the section from the interchange with Interstate 83 to Exit 104 opened to traffic.  In 1971, the section from Exit 104 to Exit 112 opened, while work began on the section from the George N. Wade bridge to the interchange with Interstate 83.  In 1973, work began on the section from Exit 57 to the George N. Wade Bridge.  In 1975, the bridge was finally completed, and the following year, the entire Interstate was completed just in time for our country's Bicentennial celebration.

Work began in April 2001 to rebuild the highway from Exit 20 to north of Exit 24.  The $25.4 million project included complete pavement removal and concrete replacement on both the northbound and southbound highways and shoulders, extension of the ramps at two interchanges, bridge improvements, new drainage, improved guiderails, and updated signing.  Bridges carrying Pine Stump Road, PA 696, and Mainsville Road were also rehabilitated.  The work was completed in Fall 2003.

Work also began in that same month on another section of I-81 from the Susquehanna River to north of the interchange with Interstate 83.  The $74.5 million project will include reconstruction of all six lanes of the highway and shoulders, some interchange ramp improvements, rebuilding of bridge decks with some widened, upgrading signage including installation of new overhead variable message signs (VMS), new drainage, and new guiderail.  The work is scheduled to be completed in 2004.  Project website:  http://www.penndot8.net/index02-a.htm.

 

Traffic and construction at I 83
Northbound traffic and construction at the I-83 interchange.
(PENNDOT)

 

Demolition of the northbound bridge at I 83
Demolition of the northbound bridge at the I-83
interchange. (PENNDOT)

On May 16, 2001, State Senator Terry Punt (R) secured a commitment from the Pennsylvania Department of Transportation to start the process of widening the highway to six lanes on a 77-mile section in southern Pennsylvania from the Maryland state line to PA 581 and from I-83 to I-78.  Also, the ramps onto and off of the Interstate would be lengthened to current standards.  The state would join Virginia, West Virginia, and Maryland in planning to widen the current four-lane Interstate.  PENNDOT recommended to the Pennsylvania Transportation Commission on May 24 that the study be given "immediate priority status" on the commission's 12-year plan.  Senator Punt said state and federal money will fund $2 million study and take up to two years to complete.  In 1998, a multi-state task force recommended that Pennsylvania study widening the highway; however, PENNDOT emphasized improving the highway surface.  The senator lobbied during the past four years to win approval of the project.  He said that the highway is currently being "strangled and suffocated" by the volume of traffic, which it was not designed to carry.  The entire project could cost between $200 and $400 million and take 10 years to complete.  Project website:  http://www.i-81study.com/.

Drivers on Interstate 81 between milemarker 108 and milemarker 158 could breathe a little easier starting on December 6, 2001.  That day PENNDOT unveiled 102 emergency call boxes that were installed earlier in the year along the highway between those two points in Schuylkill and Luzerne Counties respectively.  Those needing help will find four buttons inside the boxes:  one for police, one for fire, one for ambulance, and a fourth for a tow truck.  After they press a button, they have the ability to talk to a state police dispatcher who makes sure the appropriate crews are dispatched to the scene.  The reason that this section was picked was that the area is prone to dense fog, high winds, and severe winter weather conditions.  The boxes were a part of a $1.6 million Intelligent Transportation System, or ITS, project that included weather monitoring stations, variable message signs, and traffic counters.  Prior to this, the only highway in Pennsylvania with call boxes was the Turnpike and its extensions.

December 28, 2001 was not a good day to be on the Interstate, as a wreck on the highway outside of Hazleton claimed the life of a 13-year-old girl, according to the Luzerne County Emergency Management Agency.  The crash involved about 30 vehicles and caused multiple injuries.

Looks like the 15-year-old battle over the proposed $5.2 million Exit 7, now Exit 17, at Walker Road near Chambersburg is finally coming to an end.  On September 24, 2002, Mayor Tom Newcomer of Chambersburg cast his first tie-breaking vote when Borough Council hit a deadlock on the issue of construction of this interchange and another south of the town.  Councilman Allen Coffman, agreeing with a citizens' group on the matter, says that federal funding should be directed from the Exit 17 project to construction of an exit south of Chambersburg to serve numerous warehouse and distribution centers that have opened there, one of which includes the Chambers-5 Business Park.  David G. Sciamanna, president of the Greater Chambersburg Chamber of Commerce has said of the controversy, "The whole agricultural protection argument was grasping at straws and just a way to find any reason to delay the project.  I think it is over."  Supporters of the exit say that it will ease congestion on US 30 and offer an alternative route to new development north of Chambersburg.  Critics say that it will not solve congestion problems, and will dump more cars on country highways and pressure rural Greene Township to develop.

One thing parents do not like while driving are noisy children in the backseat.  However, it is just that which saved Patsy Harvey of Muncie, Indiana on July 5, 2003.  She climbed into the backseat to quiet her grandchildren, while her husband Selby continued to drive southbound on the Interstate.  Minutes after doing so, a log from an overturned truck on the US 22/US 322 ramps above, came crashing down through the passenger-side windshield.  Around a dozen logs, each weighting around 1,000 pounds each, spilled onto the ramp with that stray one falling over the side and onto Interstate 81.  The family and driver of the truck were taken to Holy Spirit Hospital and treated for minor injuries.

Links:
Exit Guide
Interstate 81 Pictures
Capital Beltway Safety Program - PENNDOT District 8
Interstate 81 Circa 1960 Photo Gallery - PENNDOT District 4
Capital Beltway Photos - Alex Nitzman
Highway 81 Revisited - James Wilkins/Kim Wilkins
I-81 Freeway Scenes - Alex Nitzman
I-81 Stack Interchanges - Alex Nitzman
Interstate 81 - Steve Alpert
Interstate 81 - Andy Field/Alex Nitzman
Interstate 81 - David Steinberg
Interstate 81 Pictures - Andy Field/Alex Nitzman


Information INFORMATION
Southern
Entrance:
Maryland state line at State Line.
Northern
Entrance:
New York state line two miles north of Great Bend.
Length: 233 miles
National
Highway
System:
Entire length
Names: American Legion Memorial Highway
Capitol Beltway:  I-83 to PA 581
Scranton-Dunmore Expressway:  Exit 187 to Exit 191
PennCan Highway:  Exit 191 to the New York state line
Cumberland Valley Freeway:  Maryland state line to Harrisburg
Anthracite Expressway:  Harrisburg to Scranton
SR
Designation:
SR 0081
Counties: Franklin, Cumberland, Dauphin, Lebanon, Schuylkill, Luzerne, Lackawanna, and Susquehanna
Multiplexed
Routes:
US 322:  Exit 67 to Exit 70 in Harrisburg
PA 309:  Exit 165 to Exit 170 in Wilkes-Barre
US 6:  Exit 187 to Exit 191A
Former
Designations:
None
Speed Limits: See exit guide
Emergency: 911 and call boxes from milemarker 108 to milemarker 158
PennDOT
Highway
Conditions:
Interstate 81 Conditions
Travel Radio: 530  (Harrisburg)
1610  (Wilkes-Barre/Scranton)
Area Codes: 717:  Maryland state line to the Lebanon county line.
570:  Lebanon county line to the New York state line.

Back to Pennsylvania Highways
Back to Pennsylvania Interstate Highways
Page updated January 17, 2004.
Content and graphics, unless otherwise noted, copyright © Jeffrey J. Kitsko. All rights reserved.
Information sign and Interstate shield courtesy of Richard C. Moeur.
Information courtesy of the Pennsylvania Department of Transportation, the Public Opinion of Chambersburg, the Associated Press, the Harrisburg Patriot-News, Rand McNally, Alex Nitzman, and Chris Wright.