This Interstate got its start from the Department of Highways as an upgraded US 22. In 1950, the section from the Lebanon County line to Exit 13 was upgraded, while construction began on the section from Exit 13 to Exit 17. That section was completed in 1951. In 1952, construction began on the Lehigh Valley Thruway from the current interchange with US 22 to New Jersey. In 1954, the highway was under construction from Exit 17 to Exit 19. That same year, the first section of the Lehigh Valley Thruway opened to traffic from west of PA 100 to the PA 987 interchange. The remainder of the expressway from PA 987 to New Jersey opened in 1955. Also that year, the section from Exit 17 to Exit 19 opened to traffic.
Construction began in 1956 on the section from Exit 23 to Exit 30, and in 1957 from Exit 30 to the Lehigh County line. Those two sections opened in 1958. In 1959, the section from the Berks County line to west of PA 100 opened.
In 1964, several sections were on the drawing board. The first section was from Interstate 81 to Fredericksburg, and the other was from the current PA 248 interchange south and east around Easton and into Phillipsburg, New Jersey. In 1965, the proposed new alignment was extended from Fredericksburg to the Berks County line. At that time, Interstate 78 would have gone south of the borough closer to the US 22 alignment. In 1968, construction began from Interstate 81, which was itself under construction, to the Berks County line.
In 1968, the NIMBYers in Phillipsburg, New Jersey successfully fought I-78 coming through their town. This was for the best since there are several dangerous curves on the Lehigh Valley Thruway near Easton. In 1969, the Department of Highways proposed a new Interstate 78 alignment to leave between Exit 45 and Exit 49, travel south and turn east near Emmaus and continue south of Allentown and Bethlehem. It would cross the Delaware River north of Raubsville, Pennsylvania.
In 1970, the section from Interstate 81 to the Berks County line opened to traffic. It would be the last new section of Interstate 78 to open for 19 years.
The first exit numbers to appear on the 1975 PENNDOT map showed I-78 with mileage based exit numbers, which 2001 reappeared. The last time mileage based exit numbers were shown on Interstate 78 was on the 1978 map.
In 1984, PENNDOT began construction from PA 309 east to New Jersey. NJDOT took over construction of their missing link from the toll bridge to US 22 east of Phillipsburg. In 1986, the connection from the US 22 interchange to PA 309 was still proposed, with construction beginning on it in 1987. The new section of Interstate 78 along with the 1,222-foot-long Interstate 78 Toll Bridge opened to traffic on November 21, 1989, thus completing Interstate 78 in Pennsylvania. This was just one of many expressways proposed for 30 years and never started until the 1980s in Pennsylvania.
Links:
Exit
Guide
Interstate 78 Pictures
E-ZPass - Delaware River Joint Toll Bridge Commission
Interstate 78 Toll Bridge - Delaware River Joint Toll Bridge Commission
Interstate
78 - Steve Alpert
Interstate 78 - Andy Field/Alex Nitzman
Interstate 78 - David Steinberg
INFORMATION |
|
| Western Terminus: |
I-81 at Exit 1 west of Fredericksburg. |
| Eastern Entrance: |
New Jersey state line at the Interstate 78 Toll Bridge in Easton. |
| Length: | 75 miles |
| National Highway System: |
Entire length |
| Names: | 78th Division Highway William Penn Highway: Exit 8 to Exit 51 |
| SR Designation: |
SR 0078 |
| Counties: | Lebanon, Berks, Lehigh, and Northampton |
| Multiplexed Routes: |
US 22: Exit 8 in
Fredericksburg to Exit 51 in Allentown. PA 309: Exit 51 in Allentown to Exit 60B in Allentown. |
| Former Designations: |
I-80N (1957 - 1958) |
| Speed Limits: | See exit guide |
| Emergency: | 911 |
Highway Conditions: |
Interstate 78 Conditions |
| Area Codes: | 717: Exit 1 to the Lebanon
County line. 610/484/835: Berks County line to the New Jersey state line. |