Deck pour span 5.jpg (54502 bytes)  Deck pour spn 6.jpg (45860 bytes) Click on photo for a larger view

SR-5 US-1 Low level bridge replacement over the Tomoka River.  In the photo above, the concrete is being placed, which will form the floor or deck of the new bridge. The reinforcing steel is visible where the wet concrete has not been placed.

The project is on schedule, with 32% of the contract time used. The concrete wall along the Tomoka Boat Club is installed, and soon a concrete cap will complete this phase of the work. Demolition of the next to last span of the old Northbound bridge is complete, and new piling will be installed soon.

Parts of the old bridge are stockpiled on the south side of the project. They are broken apart so they can be hauled in a truck. Then they are brought to a location where they are crushed. The reinforcing steel is removed, and recycled to form a rock like material. The final product is used in septic system leach fields. The reinforcing steel is sold for scrap metal and recycled as well.

Our company is managing another construction project for the DOT in Ormond Beach. The project involves resurfacing A1A from SR-40 north to Roberta Road. If you travel this area, see our website for that project for traffic and other information at www.bridgepros.com/a1a

Additional information will follow as the construction progresses. Should you have any questions, please contact me at (904)677-8740.

Sincerely,

Thomas R. White, PE

Senior Project Engineer

 

OUR WEB ADDRESS HAS CHANGED FOR MORE INFO AND PICTURES, VISIT OUR WEBSITE @ www.bridgepros.com/tomoka