TESTING AND GRINDING THE BRIDGE DECK TO ACHIEVE A SMOOTH RIDE 

(House moving across new bridge in photos below)

Click on thumbnail for larger picture

profilograph.jpg (52066 bytes) Deck Grinding Machine.jpg (58361 bytes) Grinding.jpg (41118 bytes)
First the bridge is tested for smoothness using the Profilograph. This device has a sensitive instrument which measures all the bumps and dips on the bridge. Next the bumps are ground down with this machine  It is connected to a tanker of water to keep the diamond blades which cut the concrete cool.

 

grinding deck.jpg (63764 bytes)

House Move 1.jpg (49338 bytes)

House Move.jpg (39942 bytes)

The concrete bridge deck following grinding. During construction we have to make provisions for all types of traffic.  Here a house is moved across the new bridge prior to opening.

 

housemove.jpg (42989 bytes)

It made it across the bridge and through our detour.