NEARING COMPLETION OF DEMOLITION OF THE OLD SOUTHBOUND BRIDGE DECK
(Photos of the bridge in photos below)
Click on thumbnail for larger picture
The last section of the old bridge is cut into pieces which
can be lifted by the crane.
The temporary wood which will support the forms.
Forms in place ready for the installation of the reinforcing
steel.
Concrete being placed with the crane with a concrete bucket. This
device transports the wet concrete from the delivery truck to the location
where it is needed.
Photos of the bridge deck being poured. The yellow machine finishes
the wet concrete to a smooth even plain. The person in
the red shirt is using a concrete vibrator to densify the wet concrete.
In this photo you can see the concrete delivery truck,
concrete pump truck and concrete testing inspectors during the deck
pour.
This is a close up of the concrete finishing machine and the
fresh concrete deck.