Click on thumbnail for larger picture
![]() |
![]() |
![]() |
In the first photo, the existing bridge deck is being removed. The next photo shows the old end bent or pile support for the end of the bridge. The third photo shows the sections of the old bridge being hoisted away.
The first photo shows the template being constructed. The next photo shows the finished template. The last photo shows the piling being placed into the template.
Views from the Tomoka Boat Club looking south at the bridge. The driveway of the boat club was resurfaced since the grade of the roadway was elevated by three feet.