Demolition of the first section of the southbound bridge deck 10/20/2000

Click on thumbnail for larger picture

rem of span 1 L.jpg (33927 bytes) end bent 1 L.jpg (43422 bytes) removal of span 1 L.jpg (48375 bytes)

In the first photo, the existing bridge deck is being removed.  The next photo shows the old end bent or pile support for the end of the bridge.  The third photo shows the sections of the old bridge being hoisted away.

  end bent 1 l template.jpg (67204 bytes)     End bent 1L template.jpg (43593 bytes)       End bent 1L piles.jpg (29309 bytes)    

The first photo shows the template being constructed.  The next photo shows  the finished template.  The last photo shows the piling being placed into the template.

  comp boat club drive.jpg (43498 bytes)    comp boat club drive a.jpg (45865 bytes)    completed right bridge.jpg (47307 bytes)

Views from the Tomoka Boat Club looking south at the bridge. The driveway of the boat club was resurfaced since the grade of the roadway was elevated by three feet.