Pouring the last section of bridge deck 8/11/2000

Click on thumbnail for larger picture

Span 4321 deck steel.jpg (53129 bytes) Deck por spn 1.jpg (63581 bytes) Deck por spn 2.jpg (52445 bytes)

The steel is ready for the next pour.    Here concrete is being placed        The finished product

 

 BidWell 2.jpg (48594 bytes) BidWell 1.jpg (38099 bytes) Curing Deck.jpg (41281 bytes)

In these photos the concrete is being finished and compacted.  Then the bridge is covered with blankets which are kept wet to prevent the concrete from curing to rapidly.  If the concrete cures (dries) too quickly cracks develop,

 

 Curing Deck Span 1.jpg (48384 bytes)