Project Team / Links

The new Lyons Bridge is being built using a contract delivery method called Design-Build. Under the Design-Build method, the team of contractors that design the bridge will be the same team responsible for its construction. This differs from the more traditional method, where a design is completed first by the owner, and contractors bid to construct the project

Design-Build is a proven system that saves time and money. The various engineers and contractors on the Lyons Bridge project are working together as a team to deliver a high-quality completed project at the lowest possible price.

PRIMARY PARTNERS:

NEW FDOT LOGO.gif (56351 bytes) h01-a[1].gif (1111 bytes) vision_logo[1].gif (2883 bytes)
Florida Department of Transportation PARSONS CORP PCL CONSTRUCTORS

CONSTRUCTION ENGINEERING & INSPECTION:

RS&H CS
Reynolds, Smith and Hills

Orlando, Florida

PCL SUBCONTRACTORS:
Ranger Construction

Signal Group

PARSONS CONTRACTORS:

WEB SITE DESIGN:
RS&H CS - Stuart, Fl.

 

RELATED WEB SITES: